Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 22, 2025 at 8:00 PM
Updated October 24, 2025
Site work for a water / sewer project in Crown Point, Indiana. Completed plans call for site work for a water / sewer project.
DESCRIPTION OF WORK: This project consists of the furnishing and installation of all equipment, labor, and materials for the sanitary sewer construction including relevant residential sewage collection systems, pump stations and mainline connections in Center Township, Lake County, IN. Bids shall be properly and completely executed on the Bid Form and must be accompanied by an Indiana State Board of Accounts Form 96, signed copies of Addenda (if issued), and satisfactory bid security, as set forth in the Project Documents. A certified or cashiers check payable to the Lake County Board of Commissioners or a bid bond in an amount equal to five (5) percent of the bid amount must accompany each bid. Bid security may be retained by the Board for a period of not to exceed thirty (30) days for all bidders and not to exceed sixty (60) days for the Bidder given tentative award of Contract. The successful Bidder will be required to provide separate Performance and Labor and Material Bonds, each in the amount of one hundred (100%) percent of the Contract amount. The Lake County Board of Commissioners reserves the right to reject any and all bids or to waive any informalities in the bidding, should the Board deem it to be in the public interest to do so. Employment - The contractor shall have a goal of Thirty-Four (34%) Percent of minority wrork force participation (as a percentage ofthe total number of employees or the total number of hours worked on the project, whichever is greater) and 6.9% for work force participation by women (as a percentage of the total number of employees or the total number of hours worked on the project, whichever is greater), ifavailable. Subcontractors and Suppliers-AgoalofThirteen (13%) PercentforMBE participation and Two (2%) Percent for WBE participation (as a percentage of the total contract amount) is hereby set for the project. The work to be done under this Contract consists of the furnishing of all labor, materials, equipment, and services and the performance of all work incidental thereto for the construction of the facilities shown and specified in the Project Documents. Locations of the project and descriptions of the work to be done under the contract as well as the specific provisions required for the contract is given later in this Section 00827. West Point Acres Subdivision, Lake County, Indiana. W 109TH AVENUE / U.S. 231 (MAIN LINE) - SHEET 3-5 HANLEY STREET (MAIN LINE) - SHEET 6-11 W 107TH COURT à U.S. 231 CROSSING (MAIN LINE) Question Deadline 09/12/2025 Any clarification, modification, or interpretation of the Project Documents will be made only by a written Addendum. The Owner and the Engineer will not be responsible for any other explanations or interpretations of the Project Documents. Each Addendum issued will be mailed to purchasers of record to whom the Project Documents have been issued, not later than three (3) days prior to the date fixed for the opening of Bids
Award
Water / Sewer
$1,889,629.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 17, 2025
October 17, 2025
To Be Determined, Crown Point, IN
Related To This Project
Crown Point, IN
Bid Date: Sep 17 2025
Crown Point, IN
Bid Date: Sep 17 2025
Crown Point, IN
Bid Date: Oct 15 2025
Crown Point, IN
Bid Date: Jan 20 2021
Crown Point, IN
Bid Date: Nov 19 2025
Crown Point, IN
Bid Date: Jan 14 2026
Crown Point, IN
Bid Date: Dec 17 2025
Crown Point, IN
Bid Date: Dec 17 2025
Crown Point, IN
--
Crown Point, IN
Bid Date: Aug 20 2025
Crown Point, IN
Bid Date: Aug 20 2025
Crown Point, IN
Bid Date: Jul 16 2025
Crown Point, IN
Bid Date: Jul 09 2025
Crown Point, IN
Bid Date: Jun 18 2025
Crown Point, IN
Bid Date: Jun 18 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
