BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2026 at 7:00 PM

Updated January 9, 2026

Site work, paving and new construction of a mixed-use development in Allentown, Pennsylvania. Working plans call for the construction of a 200,000-square-foot, two-story above grade, 164-space educational facility; fitness / recreation center; for paving for a sidewalk / parking lot; swimming pool; and library.

Plans call to construct 195,000 square-foot building. The campus floor plan primarily consists of learning centers such as classrooms, learning commons, resource commons and a series of innovation labs, including food lab, fitness wellness lab, nutrition lab, fabrication lab. The shared-use facility will contain the multipurpose gymnasium and auditorium. This will include retractable bleachers alongside a dedicated stage, with choral and band rooms neighboring the area. The district will also build a second, smaller elementary gym to the south of the main gymnasium. Additional space will be dedicated for a dining hall, studio spaces and an art studio. To the south of the main school building, ASD will build a multisport athletic field elevated above the sidewalk. The field will be used for baseball, football and soccer, provide portable bleachers seating up to 240 spectators and feature a playground. The campus’ design emphasized walkability and access to public transit, ensuring all students will be able to get to class easily and safely. The building will have four entrances, with the covered canopy main entrance situated at a key student drop off/pickup point. There will be a total of 164 parking spots around the building, as well as a separate lane for buses and a maintenance shed. The district will install high-efficiency systems for HVAC, mechanical, electrical and plumbing throughout the facility. As of January 8, 2026, construction is slated to begin Spring 2026. However, the firm timeline has not been released.

Final Planning

Educational

$132,600,000.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
9
Bidding Soon
2,802
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2026

Project location map

1600 Hanover Ave, Allentown, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.