Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 7, 2025 at 8:00 PM
Updated October 8, 2025
Site work for a playground / park / athletic field in Little Chute, Wisconsin. Completed plans call for site work for a playground / park / athletic field.
Approximate quantities are as follows: Remove & Dispose of Treated Timber Steps 1 LS \ Furnish, Install, Maintain, & Remove 4-foot Construction Fence 575 LF \ Furnish, Install, Maintain, & Remove Silt Fence 50 LF \ Furnish, Install, Maintain, & Remove Straw Wattle 96 LF \ 4-inch Topsoil, Seeding, Fertilizing, & Type A Erosion Mat 250 SY \ Furnish and Install Weathered Granite Accent Boulders, 18 to 24-inch 25 TN \ Clearing & Grubbing 1 LS \ Tree Limbing 10 IN DIA \ Treated Lumber Steps, Complete as Specified 102 EA \ 4-foot Staircase Landing, Complete as Specified 35 EA \ 5-foot Staircase Landing, Complete as Specified 1 EA \ 6-foot Staircase Landing, Complete as Specified 5 EA \ 8-foot Staircase Landing, Complete as Specified 1 EA \ Furnish & Install Limestone Screenings for Trail Restoration 2.5 TN \ This is a unit price contract. The estimated quantities as indicated above and on the Bid Schedule are inserted only for the purpose of determining the low bidder. The Contract letting shall be subject to the provisions of Sections 66.0901, 66.0903, and 779.14 of the Wisconsin Statutes. . All blanks must be filled in for the bid to be accepted. No bid may be withdrawn for a period of 60 days from the date of the bid opening. Failure to list subcontractors or suppliers may be cause for rejection of the Bid. Bids shall be accompanied by Bid Security in the form of a Bid Bond, certified check, or cashier's check made payable to the Owner in an amount of 5 percent of the Bidder's maximum Bid price. If the successful bidder fails to execute the contract and furnish the required bonds within fifteen (15) days after the Award, the Bid Security shall be forfeited to Owner as liquidated damages. Bidder awarded a contract for the work shall be required to furnish a Performance Bond and a Payment Bond in the full amount of the contract price. Prime Contractor(s) shall furnish listing of all subcontractors and suppliers performing labor and supplying materials under the Contract that individually have a total value of $1,000 or more Project is to be substantially complete on, or before, October 31, 2025. Event Bid Description: After the official Bid closing time, Bids will be opened, reviewed and, if accepted, displayed. To access the electronic bid form, download the project documents and click the online bidding button at the top of advertisement. The electronic bid form will be available for completion beginning September 3, 2025. Owner reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work and the right to disregard all nonconforming, non-responsive, unbalanced or conditional Bids and the right to accept the Bid or Bids which best serve the interests of the Owner, subject to the provisions of Wisconsin Statutes, Sections 62.15 and 66.0901. All questions about the meaning or intent of the Contract Documents shall be submitted in writing to the Engineer via the EMAIL: brad.hartjes@rasmith.com
Award
Playgrounds / Parks / Athletic Fields
$154,434.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 10, 2025
October 10, 2025
1509 E Lincoln Ave, Little Chute, WI
Related To This Project
Little Chute, WI
Bid Date: Oct 16 2025
Little Chute, WI
Bid Date: Dec 04 2025
Little Chute, WI
Bid Date: Dec 09 2025
Little Chute, WI
Bid Date: Dec 09 2025
Little Chute, WI
--
Little Chute, WI
Bid Date: Jan 19 2026
Little Chute, WI
Bid Date: Jan 29 2026
Little Chute, WI
Bid Date: Jan 29 2026
Little Chute, WI
Bid Date: Sep 18 2025
Little Chute, WI
Bid Date: Sep 18 2025
Little Chute, WI
Bid Date: Jun 17 2019
Little Chute, WI
--
Little Chute, WI
Bid Date: Feb 06 2025
Little Chute, WI
Bid Date: Oct 24 2024
Little Chute, WI
Bid Date: Apr 11 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
