Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 4, 2025 at 7:00 PM
Updated November 5, 2025
Site work and paving for a civil project in Saint Augustine Beach, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The construction of drainage, utility, and roadway improvements in the Court Theophelia Neighborhood, located in Saint Augustine Florida - northeast of the intersection of Charles Usinas Memorial Highway (SR-16) and North Ponce De Leon Blvd (US-1). The project includes the following streets: Court Edna, Court Theophelia, Court Louise, Bannan Avenue and Colony Street. The construction and copy of the record (as-built) drawings shall be completed no later than June 30, 2026. Final invoice submitted no later than Sept. 30, 2026. This project is currently funded through the Resilient Florida Grant Program and, therefore, is subject to Florida Department of Environmental Protection (FDEP) and federal funding requirements. The Contractor shall be responsible for furnishing or contracting all labor, materials, equipment, tools, transportation and supervision and for performing all work per sealed engineering designs and construction plans. Question Deadline 10/06/2025 at 5:00 PM ET Question Response Deadline : October 9, 2025, 5:00pm The City shall obtain all necessary easements and right-of-way permits for the project. The construction scope of work shall include constructing a new stormwater system for the neighborhood including adding curb inlets and stormwater pipes. A bioswale will be constructed on the east side of Bannan Avenue. The stormwater pipes shall flow to a Nutrient Separating Baffle Box on the northeast side of the project prior to discharge to the wetlands connected to the intracoastal waterway. This project also includes extending sanitary sewer pipes and replacing the potable water mains and services. This project shall also include reconstruction of Court Edna, Court Theophelia, Court Louise, Bannan Avenue and Colony Street. The project also includes constructing new sidewalks, including the ADA-compliant curb ramps.
Award
Water / Sewer
$3,126,990.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 22, 2025
November 21, 2025
Ct Theophelia, Saint Augustine Beach, FL
Related To This Project
Saint Augustine Beach, FL
Bid Date: Nov 05 2025
Saint Augustine Beach, FL
Bid Date: Oct 09 2025
Saint Augustine Beach, FL
Bid Date: Oct 22 2025
Saint Augustine Beach, FL
Bid Date: Sep 04 2025
Saint Augustine Beach, FL
Bid Date: Sep 18 2025
Saint Augustine Beach, FL
Bid Date: Sep 09 2025
Saint Augustine Beach, FL
Bid Date: Sep 24 2025
Saint Augustine Beach, FL
Bid Date: Oct 08 2025
Saint Augustine Beach, FL
Bid Date: Sep 24 2025
Saint Augustine Beach, FL
Bid Date: Sep 04 2025
Saint Augustine Beach, FL
--
Saint Augustine Beach, FL
Bid Date: Sep 04 2025
Saint Augustine Beach, FL
--
Saint Augustine Beach, FL
Bid Date: Aug 21 2025
Saint Augustine Beach, FL
Bid Date: Sep 04 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
