BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2025 at 7:00 PM

Updated November 5, 2025

Site work and paving for a civil project in Saint Augustine Beach, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The construction of drainage, utility, and roadway improvements in the Court Theophelia Neighborhood, located in Saint Augustine Florida - northeast of the intersection of Charles Usinas Memorial Highway (SR-16) and North Ponce De Leon Blvd (US-1). The project includes the following streets: Court Edna, Court Theophelia, Court Louise, Bannan Avenue and Colony Street. The construction and copy of the record (as-built) drawings shall be completed no later than June 30, 2026. Final invoice submitted no later than Sept. 30, 2026. This project is currently funded through the Resilient Florida Grant Program and, therefore, is subject to Florida Department of Environmental Protection (FDEP) and federal funding requirements. The Contractor shall be responsible for furnishing or contracting all labor, materials, equipment, tools, transportation and supervision and for performing all work per sealed engineering designs and construction plans. Question Deadline 10/06/2025 at 5:00 PM ET Question Response Deadline : October 9, 2025, 5:00pm The City shall obtain all necessary easements and right-of-way permits for the project. The construction scope of work shall include constructing a new stormwater system for the neighborhood including adding curb inlets and stormwater pipes. A bioswale will be constructed on the east side of Bannan Avenue. The stormwater pipes shall flow to a Nutrient Separating Baffle Box on the northeast side of the project prior to discharge to the wetlands connected to the intracoastal waterway. This project also includes extending sanitary sewer pipes and replacing the potable water mains and services. This project shall also include reconstruction of Court Edna, Court Theophelia, Court Louise, Bannan Avenue and Colony Street. The project also includes constructing new sidewalks, including the ADA-compliant curb ramps.

Award

Water / Sewer

$3,126,990.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
91
Bidding Soon
1,258
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2025

November 21, 2025

Project location map

Ct Theophelia, Saint Augustine Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.