Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published October 1, 2025 at 8:00 PM
Updated October 2, 2025
Renovation of a water / sewer project in Georgetown, South Carolina. Completed plans call for the renovation of a water / sewer project.
Reference Number 0000396867 Question Deadline 09/12/2025 at 2:00 PM ET Questions regarding this Request for Bid should be submitted in writing and emailed to purchasing@georgetownsc.gov The City of Georgetown, South Carolina is seeking bids from licensed and qualified roofing contractors to perform roof repairs at the WTP office/lab building and WWTP office/lab building and shop maintenance buildings. Bid Intent Deadline 09/15/2025 02:00 PM EDT Bonding Requirements - Bid Bond 5 % Scope of Services Water Treatment Plant (WTP) Full roof system replacement of admin/lab building to include: 1. Remove and haul away of all existing roofing membrane. 3. Remove and haul away existing insulation. 4. Remove and haul away existing metal coping and flashing. 5. Furnish and install new 3.5-inch roof insulation. 6. Furnish and install new TPO roof membrane 7. Furnish and install new metal coping and flashing at parapet wall. 8. Provide roof flashing around vent pipes with new vent boots. 9. Protect buildings from water intrusion during installation. 10. Cleanup work area. Wastewater Treatment Plant (WWTP) Full roof system replacement of both admin/lab building and maintenance shop building to include: 1. Remove and haul away roof ballast. 2. Remove and haul away all existing roofing membrane. 3. Remove and haul away existing insulation. 4. Remove and haul away existing metal coping and flashing. 5. Furnish and install new 3.5-inch roof insulation. 6. Furnish and install new TPO roof membrane 7. Furnish and install new metal coping, edging, and flashing at parapet walls. 8. Provide roof flashing around vent pipes with new vent boots. 9. Furnish and install new commercial-grade gutters and downspouts 10. Protect building from water intrusion during installation. 11. Cleanup work area. Contractor shall attend one pre-construction conference with the Owner. Contractor shall comply with all applicable OSHA regulations. The allowed working hours are Monday-Friday from 7 am until 5 pm. Roof Specifications Roof Insulation: 3.5 in. - Roof insulation used with TPO system. Roof Membrane: 60-mil TPO (white) Sheetmetal Flashing: 0.32-in. aluminum Gutters and Downspouts: 0.32 in. aluminum commercial grade. New roofing assembly must meet wind design requirements for coastal areas. Manufacturer: GAF, Johns Manville, Carlisle Syntec All material submittals must be approved by the Owner prior to installation.
Bid Results
Water / Sewer
$113,547.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 24, 2025
November 24, 2025
Multiple Locations, Georgetown, SC
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
