Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 24, 2025 at 8:00 PM
Updated October 25, 2025
Renovation of a water / sewer project in Lake Ozark, Missouri. Completed plans call for the renovation of a water / sewer project.
The estimated budget, $82,500.00. Bids must be submitted on the Bid Forms provided in the Bidding Documents Package and be accompanied by the bidder's certified check or bid bond in the amount of five percent (5%) of the total bid. A performance and payment bond will be required of the successful bidder. The successful bidder will also be required to submit a certificate of insurance for worker's compensation. No bidder may withdraw his bid within 30 days after the actual date of the opening thereof. The Joint Sewer Board reserves the right to accept or reject any and all bids, when it is determined in the best interest of the Joint Sewer Board to do so, to waive informalities or irregularities, and to determine the lowest responsive and responsible bidder, and to award the contract on that basis. SPECIFICATIONS FOR SANDBLASTING & PAINTING OF CLARIFIER 1. Set up, remove hand railings, protect or cover motor, gears, and controls. 2. Sandblast entire steel structure to an SSPC-SP7 to roughen existing epoxy for bonding of new coatings, any rusted or areas where needed blast to an SSPC-SP10. 3. Spot paint any and all areas that were blasted to an SSPC-SP10 with Sherwin Williams Dura-Plate 235 by brush and roller method. 4. Brush and roll edges, weld seams, bolts, nuts, and appurtenances with a 20% thinned Dura Plate 235. 5. Seam Seal lap plates or skip welded areas with Sherwin Williams Steel Seam FT910. 6. Spray apply 1 full coat of Sherwin Williams 100% Solids epoxy to entire steel structure. 7. Steel structure above waterline (bridge and walkway) will receive an additional coat of Sherwin Williams High Solids Polyurethane applied by brush and roller. 8. Remove any protective coverings/spray foam fillers and replace hand railing. 9. Remove & dispose of blast media. Bid Result - Sandblast & Paint Clarifier #1 - Mongan Painting, LLC - $78,570.00 Paint Headworks & R&R Ceiling Tile - Mongan Painting, LLC - $12,200.00
Award
Water / Sewer
$90,770.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 10, 2025
October 27, 2025
To Be Determined, Lake Ozark, MO
Related To This Project
Lake Ozark, MO
Bid Date: Oct 24 2025
Lake Ozark, MO
Bid Date: Nov 14 2025
Lake Ozark, MO
Bid Date: Mar 05 2026
Lake Ozark, MO
Bid Date: Mar 05 2026
Lake Ozark, MO
Bid Date: Mar 05 2026
Lake Ozark, MO
Bid Date: Feb 27 2026
Lake Ozark, MO
Bid Date: Jul 16 2025
Lake Ozark, MO
Bid Date: Jul 18 2025
Lake Ozark, MO
Bid Date: Jan 22 2025
Lake Ozark, MO
Bid Date: Oct 11 2024
Lake Ozark, MO
Bid Date: Sep 16 2024
Lake Ozark, MO
Bid Date: Sep 16 2024
Lake Ozark, MO
Bid Date: Jul 03 2024
Lake Ozark, MO
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
