BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 3, 2025 at 7:00 PM

Updated November 4, 2025

Site work and paving for a mixed-use development in Lake Ozark, Missouri. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

This project consists of construction for the City of Lake Ozark - Bagnell Dam Boulevard Sidewalk Construction including: Construction of approximately 2,200 ft of sidewalk including landings and ramps along Bagnell Dam Boulevard and Highway 242, installation of approximately 1,350 linear feet of curb and gutter, reconstruction of Bagnell Dam Boulevard and Highway 242 Intersection with crosswalks, storm water collection boxes, and all additional items as noted in Bid Tab and Sealed Drawing Set. The bid proposal shall be made on a form of proposal, which will be provided by the City, and delivered in a sealed envelope, and deposited in the office of the City Clerk on or before the time specified above. The proposal shall be accompanied by bid bond, cashier's check or certified check for an amount not less than five percent of the bid amount. The amount ofthe check or bid bond shall be forfeited to the City upon failure or refusal of the successful bidder to enter into a contract or to furnish bond after his proposal has been accepted. The City reserves the right to require the successful bidder to file proof of his ability to properly execute the project together with his record of successful completion of similar projects. The City reserves the right to reject any and all bids or proposals submitted, or to advertise for new bids. The City reserves the right to defer the acceptance of any proposal and the execution of a contract for a period not exceeding thirty (30) days after the date of opening of the bids. The successful bidder to whom the contract has been awarded shall sign and return the contract and other required certificates and documents in triplicate within ten (10) days after the date of the receipt of the award of the contract. The contractor shall commence work within fifteen (15) days after the date of written notice from the City Public Works Director to begin work and shall complete all work within one hundred and twenty days (120) calendar days. MODOT - Bagnell Dam Boulevard Sidewalk Construction All questions concerning the bid document preparation can be directed to the City of Lake Ozark City Hall at (573) 365- 5378. Project specific questions can be directed at Alpha Engineering at (573) 348-9799. Special Needs: If you have special needs addressed by the Americans with Disabilities Act Question Deadline 10/10/2025

Bid Results

Sidewalks / Parking Lot

$533,650.00

Public - City

Paving, Site Work

24

16

2

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
72
Bidding Soon
620
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2025

November 17, 2025

Project location map

Dam Boulevard and Highway 242, Lake Ozark, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.