BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 4, 2025 at 8:00 PM

Updated September 6, 2025

Site work and paving for a sidewalk / parking lot in Kingsland, Georgia. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The city of kingsland and the city of st. Marys, georgia, are jointly soliciting proposals from qualified engineering firms to provide professional design services for the design of a roundabout at the intersection of colerain road and winding road. Scope of services The selected firm shall provide the following services: preliminary assessment: conduct site surveys, review previously prepared traffic analyses, and evaluate design options for the roundabout. conceptual design: develop preliminary roundabout design alternatives to meet capacity, safety, and accessibility requirements. Determine potential right-of-way needs. detailed design: prepare final engineering drawings, specifications, and calculations for geometry, signage, lighting, pavement markings, drainage, and utility relocation. environmental and regulatory compliance: address environmental impacts, secure permits, and ensure ada compliance. stakeholder engagement: facilitate public meetings, coordinate with utility providers, and incorporate feedback from got and other agencies. cost estimation and phasing: provide preliminary construction cost estimates and a phasing plan. final deliverables: provide signed and sealed hard copies, electronic pdfs, and cad files (autocade civil3d-compatible) of all final design and engineering documents. permitting: obtain all permits necessary for construction, including got and environmental permits. The project timeline will include milestones for 30% (preliminary), 60% (intermediate), and 90-100% (final) design reviews. Questions due: September 25, 2025(submit to Hannah smith at hsmith@kingslandgeorgia.Com Project start: December 29, 2025 The city of Kingsland reserves the right to clarify any terms with the concurrence of the vendor; however, any substantial non conformity in the offer, as determined by the city of Kingsland, shall be deemed nonresponsive and the offer rejected. The city of Kingsland reserves the right to reject proposals, or any part of any proposal, containing any additional terms or conditions not specifically requested in the original conditions and specifications. The method of Contractor Selection has not been Determined at this time.

Conceptual

Sidewalks / Parking Lot

$300,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
49
Bidding Soon
916
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2026

Project location map

Multiple Locations, Kingsland, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.