BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 3, 2025

Site work and paving for a civil project in Kingsland, Georgia. Working plans call for site work for a road / highway; and for paving for a road / highway.

**As of December 2 , 2025 , this project has been cancelled due to no bids received and as of this time it is unknown if an when project will rebid. The City of Kingsland, Georgia is soliciting sealed proposals from qualified and experienced contractors to provide construction services for safety improvements along Boone Avenue, as recommended in the Georgia Department of Transportation (GDOT) Road Safety Audit performed by GDOT and Atkins, dated March 11, 2025 (RSA Report). The project includes, but is not limited to, intersection improvements, pavement restriping, and installation of signage. All questions regarding this RFP must be submitted in writing to Hannah Smith at hsmith@kingslandgeorgia.com no later than November 12, 2025 Responses will be provided via addendum. The work shall be performed in accordance with the GDOT Standard Specifications, applicable MUTCD guidelines, and the detailed recommendations #41 through #51 contained in the RSA Report (Attachment A). SCOPE OF WORK The selected contractor shall furnish all labor, materials, equipment, tools, transportation, permits, and incidentals necessary to complete the project. The general scope includes: 1. Pre-Construction Services Conduct a pre-construction meeting with City staff. Review and verify field conditions prior to mobilization. Submit a detailed work schedule, traffic control plan, and safety plan. 2. Construction Services Construct intersection modifications including curb work, ADA-compliant ramps, and improved pedestrian facilities where required. Remove existing striping and install new pavement markings using thermoplastic materials. Install new signage, relocate existing signs as indicated, and remove obsolete signage. Implement and maintain approved traffic control measures during all work activities. Ensure work meets all applicable GDOT, MUTCD, and ADA standards. 3. Post-Construction Perform final inspection with City representatives. Submit as-built documentation and maintenance recommendations. Correct any punch list items within the specified timeframe. Proposals will be evaluated based on: Relevant experience and demonstrated ability to perform similar work (30%) Project approach, schedule, and understanding of RSA recommendations (30%) Cost proposal (30%) References and past performance (10%)

Final Planning

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
49
Bidding Soon
909
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2025

May 13, 2026

Project location map

Boone Ave, Kingsland, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.