BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 23, 2025 at 8:00 PM

Updated October 24, 2025

Site work for a water / sewer project in Edina, Minnesota. Completed plans call for site work for a water / sewer project.

The City Council reserves the right to reject any or all bids or any portion thereof. 3/4 " Positive Displacement Meter 11,089 EA 1" Positive Displacement Meter 1830 EA 1.5" MACH 10 Ultrasonic Meter 331 EA 2" MACH 10 Ultrasonic Meter 225 EA 3" MACH 10 Ultrasonic Meter 89 EA 4" MACH 10 Ultrasonic Meter 43 EA 6" MACH 10 Ultrasonic Meter 1 EA Al questions regarding the Contract Documents are to be submitted to the Engineer in writing. Additions, revisions, corrections and/or clarifications considered necessary by the Engineer in response to such questions will be issued by Addenda posted by the Engineer BID QUESTIONS Nathan Kaderlik – City of Edina – 952-826-0316 Sarah Lloyd – Bolton & Menk – 612-756-3427 ROJECT LOCATION A. The project location is located in Edina, the phasing map is showing in Appendix A. 1.2 PROJECT DESCRIPTION A. The project involves but is not limited to the complete replacement of existing water meters and registers for most properties within the City. Individual elements of work shall include, but are not limited to: 1. Removal of existing water meters. 2. Coordinating with property owners to schedule meter replacements. 3. Furnishing and installing new water meters including encoder registers and radio frequency meter interface units. 4. Water service line inventories. 5. Confined space entry. 6. Other miscellaneous work shown on the plans or specified herein. 1.3 CONTRACTOR USE OF PROJECT SITE A. The Contractors use of the project site shall be limited to its construction operations. No materials shall be stored in a location as to limit access to the affected public. Any damage caused by Contractor operations to private property, including but not limited to, parking lots, trees, shrubs, material spatter, etc. shall promptly be corrected at the Contractor’s expense. The Prime Contractor organization shall perform work amounting to not less than 40 percent ofthe total original Contract. Ifthe contract contains Disadvantaged Business Enterprise (DBE) and/or Targeted Group Business (TGB) established goals, the Prime Contractor’s organization shall perform work amounting to not less than 30 percent ofthe total original Contract.

Award

Water / Sewer

$6,988,550.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

16

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
145
Bidding Soon
1,552
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2025

January 1, 2026

Project location map

Multiple Locations, Edina, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.