Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 30, 2025 at 8:00 PM
Updated October 2, 2025
Renovation of a military facility in Cheyenne, Wyoming. Completed plans call for the renovation of a military facility.
Remove Existing Unit: - Safely disconnect and remove the existing systems, including all associated components (e.g., duct connections, gas line, electrical wiring, venting). - Properly dispose of the old sytems and all associated waste materials in accordance with environmental regulations. Replace Components: - Install the new furnace according to the manufacturer's specifications and all applicable codes and regulations. The new systems shall be of an equivalent spec (e.g., Natural Gas, furnace with an 80/90 BTU/hr input and a 96% efficiency rating. The make and model are Lennox G61MPV-60C-090-07. - Connect the new natural gas unit to existing gas lines, water lines, electrical (if required) and venting system, ensuring proper fittings and seals. - Connect the systems to the existing ductwork, gas line, electrical connections, and venting system - Ensure all connections are secure and leak-free. - Inspect the existing ductwork for leaks, damage, and proper insulation. - Clean the work area, removing any debris or leftover materials. - Contractor responsible for disposing of old hot water heaters Program new controls on EMCS. - Follow existing programming for new systems install, with same parameters. All Requests For Information Due: 10:00 AM MST, 11 September 2025 Background / Purpose: To improve heating performance and reliability in Building 35 & 40, the existing heating systems will be replaced. The current units are nearing the end of lifespan and have demonstrated numerous functional problems. Additional Description: The new equipment must include the following salient description: o Building 40 Furnace: The new furnace shall be of an equivalent spec (e.g., Natural Gas, furnace with an 80/90 BTU/hr input and a 96% efficiency rating. The make and model are Lennox G61MPV-60C-090-07. o Replacement Instructions: o Site Assessment: - Conduct a site assessment to evaluate the existing furnace, including size, capacity, gas line configuration, ductwork, venting, and available space. - Recommend a replacement unit based on facility needs (e.g., BTU rating, energy efficiency). - Identify any potential challenges or modifications required for installation. - Ensure all repairs comply with local, state, and national fire safety regulations. o Safety Measures: - Implement safety protocols for the repair work, including the use of personal protective equipment (PPE). o Remove Existing Unit: - Safely disconnect and remove the existing furnace, including all associated components (e.g., duct connections, gas line, electrical wiring, venting). - Properly dispose of the old furnace and all associated waste materials in accordance with environmental regulations. o Replace Components: - Install the new furnace according to the manufacturer'specifications and all applicable codes and regulations. The new furnace shall be of an equivalent spec. -Connect the new natural gas unit to existing gas lines, water lines, electrical (if required) and venting system, ensuring proper fittings and seals. - Connect the furnace to the existing ductwork, gas line, electrical connections, and venting system. - Ensure all connections are secure and leak-free. - Inspect the existing ductwork for leaks, damage, and proper insulation. - Clean the work area, removing any debris or leftover materials. - Contractor responsible for disposing of old hot water heaters o Programming: - Program new furnace controls on EMCS. - Follow existing programming for new furnace install, with same parameters All Requests for Information (RFI's) will ONLY be accepted via email and should be sent to benjamin.c.taylor10.mil@army.mil and nickolas.l.woske.civ@army.mil with a Subject: W912L325RA008 RFI. RFI's will not be answered individually but will be compiled and the answers to all will be posted to the SAM.gov posting for this requirement for all to see.
Award
Military
$121,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 18, 2025
November 17, 2025
217 Dell Range Blvd, Cheyenne, WY
Related To This Project
Cheyenne, WY
Bid Date: Oct 01 2025
Cheyenne, WY
Bid Date: Oct 16 2025
Cheyenne, WY
Bid Date: Oct 14 2025
Cheyenne, WY
Bid Date: Nov 05 2025
Cheyenne, WY
Bid Date: Oct 02 2025
Cheyenne, WY
Bid Date: Oct 09 2025
Cheyenne, WY
--
Cheyenne, WY
Bid Date: Oct 16 2025
Cheyenne, WY
Bid Date: Oct 08 2025
Cheyenne, WY
Bid Date: Sep 15 2025
Cheyenne, WY
Bid Date: Oct 02 2025
Cheyenne, WY
--
Cheyenne, WY
--
Cheyenne, WY
Bid Date: Sep 05 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed