Published October 9, 2025 at 8:00 PM
Updated October 10, 2025
Site work for a water / sewer project in Aurora, Colorado. Completed plans call for site work for a water / sewer project.
Stormwater Corrugated Metal Pipe (CMP) Rehabilitation Reference Number 0000398032 The Stormwater Corrugated Metal Pipe (CMP) Rehabilitation Project rehabilitates seven (7) CMPs that were prioritized and scheduled for 2025 in the Infrastructure Improvements Study Report dated July 2024. CMP Rehabilitation includes repairs, replacement with reinforced concrete pipe, and lining with cured-in-place pipe (CIPP) by steam water cure. CMP Rehabilitation includes repairs, replacement with reinforced concrete pipe, and lining with cured-in-place pipe (CIPP) by steam water cure. The awarded general contractor will be required to use one of the City's pre-qualified cure-in-place subcontractors. Pre-Qualified This project is open to all general contractors. The general contractor will be required to use one of the City's pre-qualified cured-in-place-pipe subcontractors. Failure to complete the work as prescribed shall be considered as a Breach of Contract and subject to Liquidated Damages which are $1,000.00 per day The Contract Documents require that all work be Substantially Complete by March 10, 2026, with Final Completion by April 9, 2026. The estimated cost for this project is from $520,000.00 to $675,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 09/29/2025 at 2:00 PM MT Questions are submitted online No, Any questions must be submitted in writing by email to Heidi Ellis, Senior Procurement Agent at heellis@auroragov.org and Richard Borchardt, Project Manager, at rborchar@auroragov.org. Emailed questions shall contain the project name and number in the email subject line, and must be received no later than time Questions will be answered via addendum posted to online.
Post-Bid
Water / Sewer
$675,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 8, 2025
November 10, 2025
To Be Determined, Aurora, CO
Related To This Project
Aurora, CO
Bid Date: Mar 10 2026
Aurora, CO
Bid Date: Oct 01 2025
Aurora, CO
Bid Date: Oct 06 2025
Aurora, CO
--
Aurora, CO
Bid Date: Sep 26 2025
Aurora, CO
Bid Date: Oct 28 2025
Aurora, CO
Bid Date: Sep 18 2025
Aurora, CO
Bid Date: Oct 16 2025
Aurora, CO
Bid Date: Oct 03 2025
Aurora, CO
Bid Date: Sep 03 2025
Aurora, CO
Bid Date: Oct 02 2025
Aurora, CO
Bid Date: Sep 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.