BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 9, 2025 at 8:00 PM

Updated October 10, 2025

Site work for a water / sewer project in Aurora, Colorado. Completed plans call for site work for a water / sewer project.

Stormwater Corrugated Metal Pipe (CMP) Rehabilitation Reference Number 0000398032 The Stormwater Corrugated Metal Pipe (CMP) Rehabilitation Project rehabilitates seven (7) CMPs that were prioritized and scheduled for 2025 in the Infrastructure Improvements Study Report dated July 2024. CMP Rehabilitation includes repairs, replacement with reinforced concrete pipe, and lining with cured-in-place pipe (CIPP) by steam water cure. CMP Rehabilitation includes repairs, replacement with reinforced concrete pipe, and lining with cured-in-place pipe (CIPP) by steam water cure. The awarded general contractor will be required to use one of the City's pre-qualified cure-in-place subcontractors. Pre-Qualified This project is open to all general contractors. The general contractor will be required to use one of the City's pre-qualified cured-in-place-pipe subcontractors. Failure to complete the work as prescribed shall be considered as a Breach of Contract and subject to Liquidated Damages which are $1,000.00 per day The Contract Documents require that all work be Substantially Complete by March 10, 2026, with Final Completion by April 9, 2026. The estimated cost for this project is from $520,000.00 to $675,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 09/29/2025 at 2:00 PM MT Questions are submitted online No, Any questions must be submitted in writing by email to Heidi Ellis, Senior Procurement Agent at heellis@auroragov.org and Richard Borchardt, Project Manager, at rborchar@auroragov.org. Emailed questions shall contain the project name and number in the email subject line, and must be received no later than time Questions will be answered via addendum posted to online.

Post-Bid

Water / Sewer

$675,000.00

Public - City

Site Work

16

18

8

7

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
1
Bidding Soon
963
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2025

November 10, 2025

Project location map

To Be Determined, Aurora, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.