BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2025 at 7:00 PM

Updated November 11, 2025

Site work and paving for a road / highway in Aurora, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of November 10th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Reference Number 0000397126 The section of E-470 which is the subject of the Project was originally constructed in 2002/2003 and consists of two lanes in each direction and interchanges at I-70, 56th Avenue, 64th Avenue, Pena Boulevard, 96th Avenue, and 104th Avenue. The Authority recently completed a traffic and revenue study that predicted the highway would experience level of service ("LOS") D congestion in this area by 2029. The Authority has therefore decided to add a third lane to maintain a high level of service to E-470 customers. The Project will result in the addition of a third lane in both directions for the 6-mile section of the highway between 104th Avenue and US-85. Fourteen (14) bridges will be widened to the ultimate four (4) lane configuration including crossings at I-76/UPRR and US-85/BNSF RR. Grading and drainage for the Project will be constructed to accommodate the ultimate eight (8) lane configuration of the highway. The existing pavement will be overlaid. The anticipated CM/GC Contract start date is approximately December 16, 2025. The Authority's construction cost estimate is approximately One Hundred Thirty-Five Million Dollars ($135,000,000.00) excluding the possible (optional) Project inclusions listed above. Design efforts began in May 2025. Final design for LLTP packages and/or phased construction packages is anticipated to be completed by the end of 2025 thru mid-2026. Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Bonding Requirements - Performance Bond 100 % - Payment Bond 100 % Question Deadline 09/19/2025 at 4:00 PM MT Questions are submitted online Yes, Questions asked during the meeting must also be submitted via online potential Proposer in order to be answered by written addendum. Additional questions may be submitted after the meeting via online.

Post-Bid

Roads / Highways

$135,000,000.00

Public - County

Paving, Site Work

1

11

848

6

Subscribe For Documents

84 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
99
Bidding Soon
1,333
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2025

June 1, 2026

Project location map

E-470, Aurora, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.