Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 10, 2025 at 7:00 PM
Updated November 11, 2025
Site work and paving for a road / highway in Aurora, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of November 10th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Reference Number 0000397126 The section of E-470 which is the subject of the Project was originally constructed in 2002/2003 and consists of two lanes in each direction and interchanges at I-70, 56th Avenue, 64th Avenue, Pena Boulevard, 96th Avenue, and 104th Avenue. The Authority recently completed a traffic and revenue study that predicted the highway would experience level of service ("LOS") D congestion in this area by 2029. The Authority has therefore decided to add a third lane to maintain a high level of service to E-470 customers. The Project will result in the addition of a third lane in both directions for the 6-mile section of the highway between 104th Avenue and US-85. Fourteen (14) bridges will be widened to the ultimate four (4) lane configuration including crossings at I-76/UPRR and US-85/BNSF RR. Grading and drainage for the Project will be constructed to accommodate the ultimate eight (8) lane configuration of the highway. The existing pavement will be overlaid. The anticipated CM/GC Contract start date is approximately December 16, 2025. The Authority's construction cost estimate is approximately One Hundred Thirty-Five Million Dollars ($135,000,000.00) excluding the possible (optional) Project inclusions listed above. Design efforts began in May 2025. Final design for LLTP packages and/or phased construction packages is anticipated to be completed by the end of 2025 thru mid-2026. Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Bonding Requirements - Performance Bond 100 % - Payment Bond 100 % Question Deadline 09/19/2025 at 4:00 PM MT Questions are submitted online Yes, Questions asked during the meeting must also be submitted via online potential Proposer in order to be answered by written addendum. Additional questions may be submitted after the meeting via online.
Post-Bid
Roads / Highways
$135,000,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 2, 2025
June 1, 2026
E-470, Aurora, CO
Related To This Project
Aurora, CO
Bid Date: Sep 03 2025
Aurora, CO
Bid Date: Oct 03 2025
Aurora, CO
Bid Date: Oct 08 2025
Aurora, CO
Bid Date: Oct 01 2025
Aurora, CO
Bid Date: Sep 17 2025
Aurora, CO
Bid Date: Sep 26 2025
Aurora, CO
Bid Date: Sep 18 2025
Aurora, CO
Bid Date: Sep 19 2025
Aurora, CO
Bid Date: Aug 21 2025
Aurora, CO
Bid Date: Sep 11 2025
Aurora, CO
Bid Date: Sep 30 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
