Published September 15, 2025 at 8:00 PM
Updated September 23, 2025
Site work and new construction of a multi-residential development in Seattle, Washington. Completed plans call for the construction of a 152,000-square-foot multi-residential development; and for site work for a multi-residential development.
The project consists of 4 buildings over 152,000 SF, Type VA and VB construction with a total of 100 proposed units and a mix of two bed, three bed, four bed flats and townhouses. Building A consists of 86 units with 1 level of below grade parking and amenity spaces. Buildings C, D and E consist of 14 total townhouses. Schedule: The project is scheduled to commence in December 2025 with an anticipated construction duration of 24 months. See Exhibit 4 Draft Project Schedule for more details. Bid Scopes: Bids are requested for all scopes. Special Requirements: Please note this project is subject to Davis Bacon Residential Prevailing Wage Rates (see Wage Schedule Decision Dated 07/18/2025). Per SHA requirements, criminal background checks are required for all employees. Community Outreach: Please see SHA Project Manual / Proposal Requirements for complete description of goals. a. Small, Minority, and Women Business Enterprises (WMBEs): The project encourages participation of WMBEs and has set a 14% WMBE subcontracting goal on the project. b. Section 3 Businesses: The project encourages participation of Section 3 Businesses and has set a 10% Section 3 Business subcontracting goal on the project. c. Apprenticeship: The subcontractor is required to make every effort to employ apprentices who are enrolled in an approved apprenticeship program. Specifically, at least 15% of the labor hours on the project must be completed by apprentices registered with the Washington State Apprenticeship and Training Council (WSATC). d. Section 3 and Targeted Section 3 Labor Hours: The subcontractor is required to comply with Section 3 and Section 00700 - 11.07 of the 'SHA Project Manual / Proposal Requirements'. The subcontractor must make every effort to ensure that at least 25% of labor hours on project are from Section 3 workers and at least 5% of labor hours on project are from Targeted Section 3 workers. Bid Packages/Forms (Required Submission with Bid) o Sample Subcontract/Purchase Order/Service Agreement o Exhibit 2 - Supplemental Information o Exhibit 3 - Bid Documents o Building Permit Correction #1 Bid Set Drawings 08/06/2025 o 90% SIP Plans o Permit Set Specifications 03/13/2025 o 087100 Door Hardware 8.28.25 o SHA Project Manual/Proposal Requirements o Construction Dewatering Design Recommendations 8.6.25 o Geotech Report Rev1 8.4.25 o Good Faith Survey 7.22.25 o Remediation Plan July 2025 o Detention Vault Structural Design 5.22.25 o Environmental Noise Study 10.18.24 o Jackson Park House and Village As-Built o Lux V Groove Steel Panels Test Report 10.11.17 o Poligon Pavillion Structure 10.7.24 o Property Line Noise Compliance 4.8.25 o SPU Solid Waste Service Plan 3.19.25 o Storm Drain Report 7.11.25 o Structural Calculations - Corr Cycle 1 8.6.25 o Wetland Reconnaissance Memo 4.8.19 o Wetland Reconnaissance Memo Addendum 1.28.25 o Woodworks ACGI Linear System o Exhibit 4 - Draft Project Schedule and Draft Logistics Plan o Exhibit 5 - Insurance Requirements o Exhibit 6 - Site Specific Safety Plan o Exhibit 7 - Billing Procedures o Exhibit 7a - GC Pay Registration Instructions o Exhibit 8 - Change Order Log o Exhibit 11 - BIM PxP Documents o Davis Bacon Residential Wage Rate Decision Dated 07/18/2025 Contracting: By submitting a bid, the Subcontractor guarantees to hold pricing until January 31, 2026, to allow for owner contracting. Award of scopes will be via Letter of Intent which will lock the winning bidder into their bid price and scope, with formal subcontracting to follow Inquiries: For any scope-specific or general inquiries during the bidding process, or for clarification regarding the bid documents or bid packages, bidders should email our Project Manager, Thomas Ly, at tly@ventureseattle.com and Estimator, Victor Roman, at vroman@ventureseattle.com. All questions must be submitted by Monday, September 8, 2025 by 5PM. Venture General Contracting LLC and Seattle Housing Authority reservesthe right: a. To reject/cancel any or all bids. b. To choose bid options (base bids/alternate bids). c. To define and waive any informalities in the bidding. d. To make a final judgment whether the bids are responsive or non-responsive.
Post-Bid
Multi-Residential
$40,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2025
November 21, 2025
14378 30th Ave NE, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Sep 12 2025
Seattle, WA
Bid Date: Sep 18 2025
Seattle, WA
Bid Date: Sep 17 2025
Seattle, WA
Bid Date: Sep 26 2025
Seattle, WA
Bid Date: Oct 22 2025
Seattle, WA
Bid Date: Dec 04 2025
Seattle, WA
Bid Date: Nov 14 2025
Seattle, WA
Bid Date: Sep 18 2025
Seattle, WA
Bid Date: Sep 19 2025
Seattle, WA
--
Seattle, WA
Bid Date: Sep 10 2025
Seattle, WA
Bid Date: Oct 14 2025
Seattle, WA
Bid Date: Oct 10 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.