BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2025 at 7:00 PM

Updated November 5, 2025

Site work and paving for a sidewalk / parking lot in Millbourne, Pennsylvania. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of November 4th, 2025, bids were rejected, Project will be rebid in January 2026.** PROJECT NUMBER MISC. NO #### Installation of sidewalk improvement features and facilities, and the replacement of shade trees, concrete curb sections, ADA handicap ramps, and concrete sidewalk sections along West Taylor Blvd. Payment bond and performance bond for 100% of the contract price. The successful Bidder will be required to furnish a Contractor's Performance Bond and a Labor and Materialmen's Bond in an amount of the accepted bid. A Maintenance Bond in the amount of 15% of the Final Contract amount will be required for a period of 18 months from the date of final acceptance by the Borough. Each bid must be accompanied by a signed commitment of the proposed surety offering to execute a Performance Bond as well as the Statement of Bidder's Qualifications and all forms required by the County of Delaware including but not limited to Bid Bond, Certified Check, or Letter of Credit, the Letter of Intent, Certificate of Authority/Statement Accompanying Proposal, the Non-collusion Affidavit, Waiver of Liens, Bidders Responsibility Questionnaire (300-9), and Subcontractor Declaration Form. The Millbourne Borough West Taylor Blvd. The Borough of Millbourne reserves the right to accept any or all bids or parts thereof, or to reject any or all bids or parts thereof, for any cause whatsoever, as they deem for the best interest of the Borough.

Final Planning

Sidewalks / Parking Lot

$122,880.00

Public - City

Paving, Site Work

3

13

2

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
892
Active Projects
463
Bidding Soon
5,951
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2025

May 5, 2026

Project location map

W Taylor Blvd, Millbourne, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.