Published November 13, 2025 at 7:00 PM

Updated November 14, 2025

Site work for a water / sewer project in Riverside, California. Completed plans call for site work for a water / sewer project.

**As of November 13, 2025 , this project has not yet been awarded. The project is expected to be awarded on January 22,2026.** The Project consists of installing approximately 16,440 linear feet of gravity sewer to serve about 253 residences. In addition to the gravity main system, the project includes on-site lateral installation, grinder pump installation where required, connections to each property, and septic tank destruction. The project includes all work located on private property to complete conversion of each address opted into the program. For more information, go to online. Bid Valid 120 calendar days Start/Delivery Date January 2026 Project Duration 660 calendar days Online Q&A Yes Q&A Deadline 10/16/2025 2:00 PM (PDT) This section specifies the methods and requirements of coordination and meetings required for project coordination. This includes coordination with DISTRICT, Federal, State and Local authorities, utilities, neighboring property owners, special events, and other contractors. Traffic Control permits, notifications, mobilization, temporary signs, barriers, lights, flagging personnel, striping, markings, and demobilization and removal. In compliance with the local, State and Federal regulations regarding storm water management during construction, the CONTRACTOR shall not allow any debris, waste materials or pollutants, originating from the CONTRACTOR's operations, to enter the storm drainage system. The CONTRACTOR shall be fully responsible for developing and implementing a Storm Water Pollution Prevention Plan (SWPPP). The CONTRACTOR shall provide all cast-in-place sitework concrete including curbs, gutters, swales, catch basins, sidewalks, steps on grade, pavements, fence and guard post embedment, underground duct bank encasement, thrust and anchor blocks for horizontal and vertical pipe bends, support blocks for valves, collars, cradles, manhole bases, splash pads, and other miscellaneous cast-in-place items indicated to be sitework concrete. This Section describes the general requirements and procedures for piping systems (pressure pipe and gravity sewer pipe) and appurtenances that apply to a number of other complimentary Specification Sections. This Section includes, but is not limited to: connections to existing piping, joint restraint systems, flexible couplings, grooved end or shoulder couplings, bolts, nuts, gaskets, polyethylene wrap, warning/identification tape, tracer wire, gate well and extension stems, temporary above ground piping (high line), field touch up, abandonment and removal of existing facilities, and salvage. This section describes the requirements and procedures for leakage and infiltration testing of gravity sewer systems. The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents. The Recipient agrees to do the following: Connect approximately 522 households currently using onsite wastewater treatment systems to the Recipient's sewer system. The Project will include installing new collection system piping, decommissioning of approximately 522 septic tanks, and constructing approximately 522 private laterals.

Bid Results

Water / Sewer

$19,912,518.00

Public - County

Site Work

97

26

38

7

Subscribe For Documents

96 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
642
Active Projects
325
Bidding Soon
3,278
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

April 1, 2026

Project location map

Multiple Locations, Riverside, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.