Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 16, 2025 at 8:00 PM
Updated September 17, 2025
Site work and paving for a mixed-use development in Sylvania, Ohio. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
LUC-CR1572-7.89 PID No. 124560 City of Sylvania Technical or scope of services questions specific to the project or RFP requirements. The City of Sylvania is requesting Letters of Interest (LoI) from Consultants for planning and engineering services. The services involve roadway engineering for the installation of an elliptical roundabout at the intersection of Brint Road and Main Street /Holland Sylvania Road. This project also includes the installation of a multi-use path along the north side of the east leg. This project involves the Preliminary Engineering (PE), Environmental Engineering (EE), and Final Engineering/ROW (FE) phases of the PDP phased approach and is anticipated to follow a Path 3 Project. Estimated Construction Cost: $2,914,900.00 Environmental & Final Engineering Completion: September 2027 Construction Start: May 15, 2028 Construction End: September 1, 2028 Prequalification Requirements for This Agreement Are Listed Below. For All Prequalification Categories Other Than Financial Management System Evaluation the Requirement May Be Met by the Prime Consultant or a Subconsultant. Also, Please Note That Only Individuals (Not Firms) Are Prequalified for Right of Way Acquisition Services. In Instances Where Prequalification for These Services is Required, a Prequalified Individual, Either Employed by the Prime Consultant or a Subconsultant, Must Be Named in Order To Meet the Requirement. For Agreements That Require Prequalification in Financial Management System Evaluation, the Prime Consultant and All Subconsultants That Provide Engineering and Design Related Services Must Be Prequalified in This Category It is anticipated that the selected Consultant will be authorized to proceed by November 2025 The Preliminary Engineering (PE) is to be completed by April 2026. Environmental (EE) and Final Engineering are to be completed by September 2027. Construction is scheduled for 2028. The attached scope provides a detailed layout of the project schedule. Disadvantaged Business Enterprise (DBE) Participation Goal None The method of contractor selection has not been determined at this time. OHDOT - RFP Engineering - Roadway Engineering for the Installation of an Elliptical Roundabout at the Intersection of Brint Road and Main Street /Holland Sylvania Road
Conceptual
Roads / Highways
$2,914,900.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
