BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Renovation of a swimming pool in Saint Marys, Georgia. Working plans call for the renovation of a swimming pool.

**As of October 30 , 2025 , this project has been cancelled due to no bids received and As of this time it is unknown if an when project will rebid. The City of St. Marys is seeking proposals from qualified contractors or firms to replace the stair system serving the Orange Crush Tube Slide Attraction as the St. Marys Aquatic Center, 301 Herb Bauer Dr., St. Marys, GA 31558. The objective of this project is to provide high- quality, durable, and safe stairs for patrons to use the Orange Crush Attraction at the St. Marys Aquatic Center. The current stair system extends from the ground level to a mid-platform, and from the mid- platform to a final platform, where riders access the slide. The city seeks to replace the stairs with a safe, durable, and low-maintenance solution. You are required to email your business name, contact person, email address, physical address, phone number, and the project name or number to Sarah Lee, Purchasing Coordinator @ slee@stmarysga.gov, to be placed on the Plan holders List. Failure to do so will prevent you from receiving any addenda that are issued. Questions regarding this project may be directed in writing to the City of St. Marys, Assistant City Manager, Charlie Williams, at 418 Osborne Street, St. Marys, Georgia, 31558 or email cwilliams@stmarysga.gov. Question Deadline 10/10/2025 at 5:00 PM ET PROJECT OVERVIEW: Project Name: Stairs Replacement for Orange Crush Attraction Location: St. Marys Aquatic Center, 301 Herb Bauer Dr., St. Marys, GA 31558 Project Duration: 120 Days Budget: $65,000* *If costs are expected to exceed this amount due to necessary platform work, a detailed justification must be included in the proposal 3.3 SCOPE OF WORK: The scope of work includes, but is not limited to: o Design and construct a new stair system from ground level to the first platform and from the first platform to the second platform. o Ensure stair design prevents standing or puddling water, allowing for safe use by wet patrons. o Incorporate slip-resistant surfaces to enhance user safety. o Construct stairs from durable, low-maintenance materials suitable for outdoor aquatic environments. o Evaluate the condition of existing platforms and, if structural work or modifications are required, include that scope within the proposal. o Ensure comp

Final Planning

Swimming Pools

$65,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
41
Bidding Soon
852
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

June 10, 2026

Project location map

301 Herb Bauer Dr, Saint Marys, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.