Published November 7, 2025 at 7:00 PM

Updated November 8, 2025

Site work for a water / sewer project in Santa Maria, California. Completed plans call for site work for a water / sewer project.

Well 15 Equipping Project Liquidated Damages $1,200/day Estimated Bid Value between $4.73M and $5.8M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project Duration 300 Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 08/19/2025 2:00 PM (PDT) In general, the work consists of, but is not limited to, furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to construct and equip Santa Maria Water Supply Well No. 15. Work shall consist of importing borrow, performing grading, drainage and site improvements, trenching for pipe and conduit, trench dewatering when applicable, installing above ground and below ground 10-inch, 12-inch and 14-inch diameter ductile iron pipes, installing gate valves, blow-off and combination air valve assemblies, hydrostatic pressure testing, flushing and disinfection of installed piping, installing electrical and communication conduit and associated access vaults, constructing building and equipment foundations, well pedestal and well pad, installing vertical turbine pump and motor, column pipe and shaft, above ground piping, valves, sand separator, surge tank, fire hydrant, associated piping and components, installing chlorination fiberglass shelter building, sodium hypochlorite feed pump assembly, chemical storage tanks, chemical injection and monitoring instrumentation, associated piping, electrical and controls, constructing eye/face wash station associated piping, drainage and controls, constructing prefabricated metal electrical and generator building, constructing interior wall, installing doors and hardware, installing electrical utility service connection, main switchboard, distribution panels, transformer, soft starter, emergency generator, supply louvers and exhaust hood, automatic transfer switch, SCADA PLC system, equipment instrumentation, HVAC, miscellaneous electrical apparatuses, building and exterior well site electrical, lighting and intrusion monitoring, installing removable pump enclosure, HVAC and associated well pump and motor electrical and communication systems, installing process control and instrumentation systems, flow, level and pressure measurement equipment, transmitters and switches, assisting the City's preferred SCADA integrator with panel installation and testing, installing chain link fencing and gates and performing associated site works and all other work identified in the Contract Documents.

Award

Water / Sewer

$4,343,870.00

Public - City

Site Work

101

58

35

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
29
Bidding Soon
540
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2025

November 10, 2025

Project location map

To Be Determined, Santa Maria, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.