BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 29, 2026 at 8:00 PM

Updated August 4, 2026

Site work and new construction of a detention facility in Santa Maria, California. Completed plans call for the construction of a detention facility; and for site work for a detention facility.

The Project consists of the design and construction of 1.5 Housing Units (6 pods containing 64 beds each), a secure connection to the existing NBJ, a new central utility plant for water utilities and water filtration, and site improvements including Fire Access roads, parking, and security fencing. The 1.5 Housing Units will include day rooms, yards, support spaces, command and control stations, non-contact visitation for the public, as well as offices and workstations for Sheriff staff. It is intended that the expansion be an all-electric facility that draws power from the existing NBJ central plant. Site utilities (water, fire water, sanitary sewer, storm water) are available at the site and able to serve the Project. Special systems such as security, fire alarm, emergency power (via existing diesel generator), among others will need to connect to, and be compatible with, existing site utilities and systems in the existing NBJ. As of July 29, 2026, construction is underway.

Under Construction

Jails / Prisons

$165,000,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
42
Bidding Soon
483
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2025

July 13, 2026

Project location map

2301 Black Rd, Santa Maria, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.