Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 3, 2025 at 7:00 PM
Updated December 4, 2025
Renovation of a municipal facility in Joliet, Illinois. Completed plans call for the renovation of a municipal facility.
HVAC Replacement Project All questions concerning the bid shall be directed to Allison Roldan at the above stated email address. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Scope of Work. Subcontractor shall do and provide all things necessary for the proper performance, installation, construction and completion of all of the ScopeOfWork hereafter called the Workto the satisfaction and acceptance of the General Contractor, Architect and Owner hereafter called Owner including, but not limited to, providing and paying for all labor, materials, tools, plant, equipment, competent full-time supervision, services, insurance and bonds and under and in accordance with the General Contract dated MainContractDate between Owner and General Contractor for the construction and completion of the ProjectName hereafter called the Project and in accordance with all General Conditions, Supplementary General Conditions, Drawings, Specifications, Addenda, Exhibits, Amendments and Alternates hereafter collectively called Contract Documents listed herein and attached hereto and subject to Article 11 herein, and made a part of this Subcontract to the same extent as if entirely restated herein and as subsequently modified by written executed Amendments and Change Orders. Subcontractor shall cause that all of the provisions of this Subcontract including the Work and all of the provisions of the contract between Owner and General Contractor (the General Contract) be specifically assumed by all sources of labor, trades and materials including all of Subcontractors own forces, subcontractors, Sub-subcontractors, suppliers, independent contractors and all other entities at any tier lower than Subcontractor (hereafter collectively called Sub-subcontractors) that have been used or will be used in connection with the performance or completion of any part of the Work. Subcontractor shall provide all engineering and design services contained in its Work, for example and without limitation, for HVAC, life safety and other systems that are included in its Work. Should the bidder require additional information about this bid, submit questions via email to: Allison Roldan via aroldan@bulley.com. Questions are required no less than 5 business days prior to Bid Opening date.
Award
Municipal
$6,570,081.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 9, 2025
November 10, 2025
102 N Chicago St, Joliet, IL
Related To This Project
Joliet, IL
Bid Date: Oct 30 2025
Joliet, IL
Bid Date: Oct 28 2025
Joliet, IL
--
Joliet, IL
Bid Date: Nov 21 2025
Joliet, IL
Bid Date: Nov 07 2025
Joliet, IL
Bid Date: Oct 17 2025
Joliet, IL
Bid Date: Oct 20 2025
Joliet, IL
Bid Date: Oct 20 2025
Joliet, IL
Bid Date: Sep 25 2025
Joliet, IL
Bid Date: Oct 23 2025
Joliet, IL
Bid Date: Oct 09 2025
Joliet, IL
Bid Date: Sep 23 2025
Joliet, IL
Bid Date: Oct 03 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
