BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Renovation of a municipal facility in Joliet, Illinois. Completed plans call for the renovation of a municipal facility.

HVAC Replacement Project All questions concerning the bid shall be directed to Allison Roldan at the above stated email address. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Scope of Work. Subcontractor shall do and provide all things necessary for the proper performance, installation, construction and completion of all of the ScopeOfWork hereafter called the Workto the satisfaction and acceptance of the General Contractor, Architect and Owner hereafter called Owner including, but not limited to, providing and paying for all labor, materials, tools, plant, equipment, competent full-time supervision, services, insurance and bonds and under and in accordance with the General Contract dated MainContractDate between Owner and General Contractor for the construction and completion of the ProjectName hereafter called the Project and in accordance with all General Conditions, Supplementary General Conditions, Drawings, Specifications, Addenda, Exhibits, Amendments and Alternates hereafter collectively called Contract Documents listed herein and attached hereto and subject to Article 11 herein, and made a part of this Subcontract to the same extent as if entirely restated herein and as subsequently modified by written executed Amendments and Change Orders. Subcontractor shall cause that all of the provisions of this Subcontract including the Work and all of the provisions of the contract between Owner and General Contractor (the General Contract) be specifically assumed by all sources of labor, trades and materials including all of Subcontractors own forces, subcontractors, Sub-subcontractors, suppliers, independent contractors and all other entities at any tier lower than Subcontractor (hereafter collectively called Sub-subcontractors) that have been used or will be used in connection with the performance or completion of any part of the Work. Subcontractor shall provide all engineering and design services contained in its Work, for example and without limitation, for HVAC, life safety and other systems that are included in its Work. Should the bidder require additional information about this bid, submit questions via email to: Allison Roldan via aroldan@bulley.com. Questions are required no less than 5 business days prior to Bid Opening date.

Award

Municipal

$6,570,081.00

Public - County

Renovation

124

27

31

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
515
Active Projects
167
Bidding Soon
3,337
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2025

November 10, 2025

Project location map

102 N Chicago St, Joliet, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.