BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 7, 2026 at 8:00 PM

Updated July 12, 2026

Site work for a water / sewer project in American Canyon, California. Conceptual plans call for site work for a water / sewer project.

WA23-0200 The City of American Canyon is soliciting proposals from qualified firms or individuals ("Proposer") to rehabilitate and replace a portion of the water treatment plant underdrain and filtration system which in general includes replacement of media in filter beds 1 and 2, under drain piping, lateral piping, surface wash piping, surface wash arms and four flap gates, all existing and new metal components epoxy coated to AWWA Standards. All proposers must hold a valid Class A - General Engineering Contractor license issued by the Contractors State License Board. More details on the City's needs for this work are provided in the scope of work. Each qualified Proposer is to submit a proposal in conformity with the terms of this Request for Proposal ("RFP") by the deadline below ("Proposal"). The Proposer selected by the City pursuant to the terms of this RFP and the City's contracting procedures, if any is selected, is referred to herein as "Consultant." The Conventional Water Treatment Plant designed and constructed to treat and produce two million gallons per day (2.0 MGD). Raw Water received from the State Water Project (SWP), North Bay Aqueduct (NBA). The Conventional Water Treatment Plant annexed to the city American Canyon which became incorporated in year 1992. To meet potable water demands in year 2005 American Canyon added a 3 MGD, Zenon Ultra-Filtration Membrane Treatment Plant. The plant flow design consist of flocculation basins, clarifier basins and filter basins. The filter basin is 462 square feet, water depth 6 feet, five inches with a total media depth of forty-nine inches. Current media from bottom to top consists of silica gravel depth ten inches, high density support gravel nine inches, high density support sand depth three inches, intermediate sand depth nine inches and coal depth eighteen inches. The specification of media size is referenced on the original construction drawings that will be provided. Question Submission Deadline:July 22, 2026, 5:00pm The Contractor must hold a valid Class A - General Engineering Contractor license issued by the Contractors State License Board. Consultant Selection Date:August 7, 2026 The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$350,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
493
Active Projects
33
Bidding Soon
3,423
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2026

Project location map

151 Mezzetta Ct, American Canyon, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.