Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 26, 2025 at 7:00 PM
Updated December 27, 2025
Site work and new construction of a detention facility in Santa Maria, California. Working plans call for the construction of a detention facility; and for site work for a detention facility.
The owner has determined a prequalified list of design build companies Request for Qualifications for Design-Build Services for the North Branch Jail Expansion. Project Objectives o Design and construct a Project that will achieve Design Excellence (see2.6.10). o Establish a collaborative relationship between the Owner and the Design-Build Team to deliver guality design and construction on time and within the Owner's budget. o Minimize disruptions to Sheriff operations during construction through collaborative scheduling and coordination, o Maintain a safe, injury free worksite. 2.4 Project Budget The budget ("Stipulated Sum" or "Budget") for the Scope of Work referenced in Section 2.3 is One Hundred Sixty-Five Million Dollars ($165,000,000.00). 2.3 Scope of Work The Project consists of the design and construction of 1.5 Housing Units (6 pods containing 64 beds each), a secure connection to the existing NBJ, a new central utility plant for water utilities and water filtration, and site improvements including Fire Access roads, parking, and security fencing. The 1.5 Housing Units will include day rooms, yards, support spaces, command and control stations, non-contact visitation for the public, as well as offices and workstations for Sheriff staff. It is intended that the expansion be an all-electric facility that draws power from the existing NBJ central plant. Site utilities (water, fire water, sanitary sewer, storm water) are available at the site and able to serve the Project. Special systems such as security, fire alarm, emergency power (via existing diesel generator), among others will need to connect to, and be compatible with, existing site utilities and systems in the existing NBJ. The Project is expected to be rooftop "solar ready" (no installed array or panels), and must also utilize the Crime Prevention Through Environment Design ("CPTED") standards. The final plans and specifications shall specifically note the design has been developed in accordance with the CPTED standards. Questions pertaining to this RFQ must be submitted in writing via Public Purchase Question Deadline 10/10/2025 at 5:00 PM PT
Final Planning
Jails / Prisons
$165,000,000.00
Public - County
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 30, 2025
June 29, 2026
2301 Black Rd, Santa Maria, CA
Related To This Project
Santa Maria, CA
Bid Date: Oct 21 2025
Santa Maria, CA
Bid Date: Dec 10 2025
Santa Maria, CA
Bid Date: Jan 22 2026
Santa Maria, CA
Bid Date: Jan 14 2026
Santa Maria, CA
Bid Date: Jan 15 2026
Santa Maria, CA
Bid Date: Jan 22 2026
Santa Maria, CA
Bid Date: Dec 11 2025
Santa Maria, CA
Bid Date: Dec 11 2025
Santa Maria, CA
Bid Date: Oct 03 2025
Santa Maria, CA
Bid Date: Sep 18 2025
Santa Maria, CA
--
Santa Maria, CA
Bid Date: Oct 14 2025
Santa Maria, CA
Bid Date: Sep 11 2025
Santa Maria, CA
Bid Date: Sep 16 2025
Santa Maria, CA
Bid Date: Sep 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
