BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 21, 2025 at 8:00 PM

Updated October 22, 2025

Site work and renovation of a mixed-use development in Newport News, Virginia. Completed plans call for the renovation of a laboratory facility; and for site work for a water / sewer project.

The scope of the project is to install (2) fibber-optic cables originating from the b08 control room rack to (2) separate buildings (b01 & b85). Installation will require entry into the manhole system. The subcontractor is responsible for all required training and all equipment needed for a complete and functioning system. Entry into each manhole will require a confined space entry permit. The subcontractor is responsible for all confined space entry equipment, including a pump with sediment bag, for a safe entry into the confined space. All terminations, termination equipment, and cabling shall be tested. The test report shall be turned over to the tr prior to final payment. Lengths of fibber given in this scope of work are approximate. The subcontractor is responsible for obtaining accurate distances for fibber prior to bid. Each fibber to be corning freedom single-mode I/o fibber. Ends to be terminated with lc ends. Fibber distribution units (fdus) shall be corning type cch. Question Deadline 10/09/2025 All inquiries regarding this solicitation must be received Any questions related to the RFP/RFQ must be in writing and should be sent by email or by fax to the attention of the Procurement Officer or mailed to the Procurement Office Seth Frisby 757-209-3824 and Melissa Torres 757-269-7585 torres@jlab.org Small Business Set Aside: No The Subcontractor shall - (a) commence work under this subcontract within five (5) calendar days after a purchase order is awarded, (b) prosecute the work diligently, and (c) complete the work scope no later than December 31, 2025 following contract issuance/award. The time stated for completion includes final cleanup of the premises and submission of all required documentation.

Post-Bid

Laboratories

$250,000.00

Public - Federal

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
71
Bidding Soon
1,326
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2025

November 17, 2025

Project location map

To Be Determined, Newport News, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.