Site work for a mixed-use development in Gary, Indiana. Completed plans call for site work for a transportation facility.

*Path Construction is requesting bids November 17, 2025 by 2 pm. The work includes a new Air Traffic Control Tower and associated civil site work. The Tower is seven (7) stories including the Control Cab level. The total square footage of the Tower is 7,544 SF per the 2012 International Building Code (IBC) w/2014 Indiana Building Code amendments; the buildings Occupancy Classification is Business: Group B. The building is designed to be structural precast concrete with a steel framed Control Cab. Trades included but not limited to: Concrete Forming & Accessories, Concrete Reinforcing, CIP, Precast Structural Concrete, Concrete Topping, Structural Steel & Cold Formed Framing, Steel Decking, Metal Pan Stairs, Pipe & Tube Railings, Rough Carpentry, Plastic-Laminate-Clad Architectural Cabinets, Dampproofing, Waterproofing, Traffic Coatings, Insulation, Fluid-Applied Membrane Air Barriers, Composite Stone Wall Panels, (Kee) Roofing, Applied Fire Protection, Penetration & Joint Firestopping, Joint Sealants, D/F/H, Aluminum Framed Entrances & Storefronts, Glazed Aluminum Curtain Walls, Glazing, ATCT Cab Laminated Glazing, Fixed Louvers, Drywall, Ceramic Tiling, Acoustical Ceilings, Resilient Base, Accessories, & Tile Flooring, Tile Carpeting, Access Flooring, Sound Absorbing Wall Units & Ceiling Units, Exterior & Interior Painting, Signage, Wall & Door Protection, Toilet, Bath & Laundry Accessories, Fire Protection Cabinets & Extinguishers, Photoluminescent Egress Path Markings, Retractable Stairs, Window Shades, Solid Surface Cabinets, Elevators, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Access Control, Video Surveillance, Fire Alarm, Emergency Response System, Dewatering, Drilled Concrete Piers & Shafts, Excavation, Asphalt Paving, Landscaping, & Site Utilities. *Bidders must contact engineer to bid packets and to become official plan holders. All provisions of Buy American Preference 49 USC 50101; Foreign Trade Restriction 49 USC 50104, 49 CFR part 30 ; Davis Bacon 2 CFR 200 Appendix II(D), 29 CFR part 5 ; Disadvantaged Business Enterprise -49 CFR part 26; Debarment and Suspension 2 CFR part 180 (Subpart C), 2 CFR part 1200, DOT Order 4200.5; Lobbying Federal Employees - 31 USC 1352 Byrd Anti-Lobbying Amendment, 2 CFR part 200, Appendix II(J) 49 CFR part 20, Appendix A; Procurement of Recovered Materials 2 CFR 200.322, 40 CFR part 247 and Solid Waste Disposal Act; and are herewith incorporated by reference, the same as if all of the provisions were completely set out herein. Goals for minority participation for each trade: Lake County, IN 20.9% Goals for female participation for each trade: National 6.9% These goals are applicable to all of the Contractor s construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the Contractor also is subject to the goals for both its federally involved and non-federally involved construction. The Contractor s compliance with the Executive Order and the regulations in 41 CFR part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a) and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor s goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographic area in which the subcontract is to be performed. As used in this notice and in the contract resulting from this solicitation, the covered area is Indiana, Lake County, Gary . The Gary/Chicago International Airport Authority , in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C 2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprise will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. A certified check or bank draft payable to the Gary/Chicago International Airport Authority , or a satisfactory bid bond, executed by the Bidder and an approved surety company in an amount not less than five (5) percent of the bid, shall be submitted with each bid proposal. Contractors awarded a contract will be required to furnish acceptable surety bonds in the amount of 100% of the awarded contract price. Said performance and material and payment bond shall remain in effect for twelve (12) months. Question Deadline 10/20/2025 All questions regarding this project must be in writing at least three (3) days prior to the bid opening. Answers to written questions will be provided by addenda to all bidders. Written questions may be mailed, faxed or e-mailed to: Ken Ross, P.E. NGC Corp. 38 Hackney Road Ravenswood, WV 26164 E-mail: kross@ngc.aero All questions shall be delivered by e-mail. Questions by phone will not be accepted. The Engineer will provide responses via addenda. The Work includes a new Air Traffic Control Tower and associated civil site work. The Tower is seven (7) stories including the Control Cab level. The total square footage of the Tower is 7,544 sf. Per the 2012 International Building Code (IBC) w/ 2014 Indiana Building Code amendments, the buildings Occupancy Classification is Business: Group B. The building is designed to be structural precast concrete with a steel framed Control Cab. PN - 223128.

Post-Bid

Transportation Terminals

$5,000,000.00

Public - City

Site Work

285

27

27

5

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
441
Active Projects
264
Bidding Soon
3,170
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2025

December 25, 2025

Project location map

6001 Airport Rd, Gary, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.