Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 29, 2025 at 8:00 PM
Updated October 30, 2025
Demolition, site work and paving for a civil project in Long Beach, California. Completed plans call for site work for a water / sewer project; for the demolition of a bridge / tunnel; bridge / tunnel; and for paving for a bridge / tunnel.
City of Long Beach, California, acting by and through the City's Board of Harbor Commissioners ("City") will receive, before the Bid Deadline established below, Bids for the following Work:Pier B Shoemaker Bridge Ramps Demolition at Shoemaker Bridge All questions, including requests for interpretation or correction, or comments regarding the Contract Documents, must be submitted no later than October 21, 2025 at 5 p.m. Questions received after the pre-Bid question deadline will not be accepted. Neither questions nor answers are part of the Contract Documents, unless the question and answer result in an addendum. Questions must be submitted electronically. Emails, phone calls, and faxes will not be accepted. Questions submitted to City staff will not be addressed and Bidder will be directed to online. The Work required by this Contract includes, but is not limited to, the following: Demolish the existing 9 th and 10 th Street structures to and from Shoemaker Bridge, including superstructure, pile caps, columns, and foundation at certain areas; remove the pavement along the loop ramps to and from the existing Shoemaker Bridge and other access roads between 9 th and 10 th Streets; and remove other roadway features, including curb and gutter, street lights, inlets, signs, vegetation, protective barriers, and other miscellaneous items The Contractor shall achieve Substantial Completion of Work within 343 calendar days and Affidavit of Final Completion of the Project within 433 calendar days as provided in Paragraph SC - 6.1 of the Special Conditions, from a date specified in a written "Notice to Proceed" issued by the City and subject to adjustment as provided in Section 8.2 of the General Conditions. FAILURE OF THE CONTRACTOR TO COMPLETE THE WORK WITHIN THE CONTRACT TIME AND OTHER MILESTONES SET FORTH IN THE SPECIAL CONDITIONS, INCLUDING THE ENGINEER'S APPROVAL OF AFFIDAVIT OF FINAL COMPLETION, WILL RESULT IN ASSESSMENT OF LIQUIDATED DAMAGES IN THE AMOUNTS ESTABLISHED IN THE SPECIAL CONDITIONS. NIB -6 Contractor's License. The Bidder shall hold a current and valid Class "A", California Contractor's License to construct this project. The combined SBE/VSBE participation goal for this Project is twenty-one percent (21%) of total bid value. Each Bid shall be accompanied by a satisfactory Bidder's Bond or other acceptable Bid Security in an amount not less than ten percent (10%) of the Base Bid as a guarantee that the Bidder will, if Conditionally Awarded a Contract by the Board, within thirty (30) calendar days after the Contract is conditionally awarded to the Contractor by the City, execute and deliver such Contract to the Chief Harbor Engineer together with all required documents including insurance forms, a Payment Bond for one hundred percent (100%) of the Contract Price, and a Performance Bond for one hundred percent (100%) of the Contract Price. All Bonds shall be on forms provided by the City. The Board , acting through the Chief Executive Officer, reserves the right at any time before the execution of the Contract by the City, to reject any or all Bids, and to waive any informality or irregularity. The Conditional Award of the Contract, if any, will be to the responsible Bidder submitting the lowest responsive and responsible Bid. If the lowest responsive responsible Bidder fails to submit the required documents including insurance forms, bonds and signed Contract within thirty (30) calendar days after Conditional Award of Contract, the Board reserves the right to rescind the Conditional Award and Conditionally Award the Contract to the next lowest responsive and responsible Bidder. Bids shall remain open and valid and Bidder's Bonds and other acceptable Bid Security shall be guaranteed and valid for ninety (90) calendar days after the Bid Deadline or until the Chief Executive Officer executes a Contract, whichever occurs first.
Bid Results
Bridges / Tunnels
$22,341,000.00
Public - City
Demolition, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
