BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 25, 2025 at 8:00 PM

Updated October 26, 2025

Renovation of a bridge / tunnel in Richfield, Minnesota. Completed plans call for the renovation of a bridge / tunnel.

Question Deadline: Fri Oct 17, 2025 12:00 PM (CDT) Questions in writing cut-off Submit questions to the Purchasing representative by clicking on the Submit a Question button for this specific RFP in the RFP System. It is the responsibility ofthe Vendor to inquire about any portion ofthe RFP that is not fully understood or susceptible to more than one interpretation Description: The City of Bloomington is seeking proposals from qualified individuals, firms, partnerships, and corporations having specific experience in the area(s) of investigation, design, plan production and construction administration for the preservation of multiple bridges in the State of Minnesota, and interested in providing these consulting services to the City. Replace timber retaining walls with Precast Modular Block Walls (other options can be proposed). Replace deck timbers and tie-down straps. Review condition and repair any damaged truss members. Paint the bridge. Rebuild bridge approaches on both sides of bridge and maintain ADA compliance. Incorporate public art and introduce options for lighting features. Sandblasting and painting of approximately 15% of north K-frame girder. Clean and seal concrete bridge railings. Flood seal of bridge deck. This will also include a flood seal of the American Boulevard Bridge over Highway 100 (Bridge #27647) and the Auto Club Bridge (Bridge #27563) decks. Regrade west slope and install erosion control measures under the bridge. There will be additional grading and retaining wall work done under the west side ofthe 106th St bridge adj acent to the existing trail that runs next to Nine Mile Creek. This work will be completed with the Nine Mile Creek Corridor Renewal Project in 2026 and 2027 and will have to be coordinated with this project. The work as part ofthe Nine Mile Creek Corridor Renewal Project will include maintenance of the existing timber walls under the west side of the bridge adjacent to the trail that runs along Nine Mile Creek. Potential repair and sealing ofthe concrete parapet below the metal railings. Replace missing anchor rods ofthe metal railing and perform in-depth inspection ofsimilar rods. This individual will be Bob Simons who can be reached at 952-563-8758 or bsimons@bloomingtonmn.gov. The City bridge staff will also be available throughout the project All inquiries, questions, or clarifications must be submitted at least seven (7) calendar days prior to the due date of this RFP. Late inquiries, questions, or clarifications will not be answered

Post-Bid

Bridges / Tunnels

$435,000.00

Public - City

Renovation

153

6

4

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
0
Bidding Soon
790
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2025

September 1, 2026

Project location map

Multiple Locations, Richfield, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.