Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 6, 2025 at 8:00 PM
Updated October 7, 2025
Site work and new construction of a military facility in Box Elder, South Dakota. Working plans call for the construction of a military facility.
This project involves the construction of Environmental Protection Shelters (EPS) for the B-21 60 Row South at Ellsworth Air Force Base, South Dakota. The work includes all necessary labor, materials, and equipment to build the shelters in accordance with the specifications provided. The scope encompasses site preparation, structural construction, utility installation, and any associated tasks required to complete the EPS facilities to support the B-21 mission. Location: Ellsworth Air Force Base, 1000 Ellsworth Street, Box Elder, SD 57719, United States. Magnitude: The estimated construction cost of this project is between $25,000,000 and $100,000,000. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Military
$100,000,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 8, 2025
To Be Determined, Box Elder, SD
Related To This Project
Box Elder, SD
--
Box Elder, SD
--
Box Elder, SD
Bid Date: Sep 24 2025
Box Elder, SD
Bid Date: Jan 15 2026
Box Elder, SD
Bid Date: Oct 21 2025
Box Elder, SD
Bid Date: Apr 07 2021
Box Elder, SD
--
Box Elder, SD
Bid Date: Jul 17 2025
Box Elder, SD
Bid Date: Jun 26 2025
Box Elder, SD
Bid Date: Aug 13 2025
Box Elder, SD
Bid Date: Jun 17 2025
Box Elder, SD
Bid Date: Jul 31 2025
Box Elder, SD
Bid Date: Aug 06 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
