Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 2, 2025 at 7:00 PM
Updated December 5, 2025
Site work for a mixed-use development in Menifee, California. Completed plans call for site work for a educational facility; educational facility; and educational facility.
Mesa View Elementary / Ethan A Chase Middle / Boulder Ridge Elementary Modulars Sitework. Mesa View Elementary School (DSA #04-124767) (RSD Project #24-25-09) Ethan A Chase Middle School (DSA #04-124758) (RSD Project #24-25-10) Boulder Ridge Elementary School (DSA #04-124766) (RSD Project #24-25-11) Each bidder shall be a licensed contractor pursuant to the California Business and Professions Code, and be licensed to perform the work called for in the Contract Documents. The successful bidder must possess a valid and active Class B License at the time of bid and throughout the duration of this Contract. Prequalification of Bidders: As a condition of submitting a bid for this Project, and in accordance with California Public Contract Code section 20111.6, prospective bidders are required to submit to the District a completed set of prequalification documents on forms provided by the District. These documents will be the basis for determining which bidders are qualified to bid on this Project. Bids will not be accepted if a Contractor has not been prequalified where prequalification is required. The Romoland School District utilizes Quality Bidders for prequalification. Prequalification documents shall be completed at https://www.qualitybidders.com. Prequalification documents must be submitted by November 20th, 2025. Contractors will be notified by email of their prequalification rating. If this Project includes work that will be performed by mechanical, electrical or plumbing (MEP) subcontractors (contractors that hold C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 licenses), such MEP subcontractors must also be prequalified. Question Deadline 11/14/2025 at 3:00 PM PT Any questions relative to the bid shall be in writing and directed to: Derek Stemrich, Architect/Associate Principal - PJHM Architects derek@pjhm.com, Cc: Jon Parham, Director MOT&F - Romoland School District, jparham@romoland.net
Post-Bid
Educational
$2,000,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2025
December 15, 2025
Multiple Locations, Menifee, CA
Related To This Project
Menifee, CA
Bid Date: Oct 31 2025
Menifee, CA
Bid Date: Dec 22 2025
Menifee, CA
Bid Date: Dec 19 2025
Menifee, CA
Bid Date: Jan 07 2026
Menifee, CA
--
Menifee, CA
Bid Date: Oct 08 2025
Menifee, CA
Bid Date: Aug 31 2020
Menifee, CA
Bid Date: Sep 02 2025
Menifee, CA
Bid Date: Jul 31 2025
Menifee, CA
Bid Date: Jul 21 2025
Menifee, CA
Bid Date: Sep 04 2025
Menifee, CA
Bid Date: Jun 26 2025
Menifee, CA
Bid Date: Jun 23 2025
Menifee, CA
Bid Date: Jun 23 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
