BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 16, 2025 at 7:00 PM

Updated December 17, 2025

Site work for a civil project in Key West Nas, Florida. Completed plans call for site work for a one-story above grade water / sewer project.

Crawl Key Reverse Osmosis Facility - Supply & Injection Wells. Bid Bond 5% The FKAA reserves the right to reject all Submittals where the FKAA deems rejection to be in its best interest, or to reject any Bid/Proposal not in compliance with the specifications. The FKAA reserves the right to waive any informalities and irregularities in said Submittals. The Grantee will construct a new 4 MGD reverse osmosis WTP facility. The facility will include an above ground storage tank for potable water, pump station, source water withdrawal wells, effluent injection well, access roads, parking, and a stormwater treatment pond. PROJECT BACKGROUND: Florida Keys Aqueduct Authority (FKAA, Grantee) will construct a new 4 million gallons per day (mgd) seawater reverse osmosis (RO) water treatment plant (WTP) at Crawl Key. Growing demand for limited water resources requires the FKAA to increase its supply. With increasing water demands, the FKAA may not have enough supply to meet future water needs. The increase in supply will benefit all customers by providing water for drinking, bathing, irrigation, and servicing the economically vital tourist industry. It will include a new WTP, an above ground storage tank, and a new pump station to deliver potable water into the existing transmission main system. This project consists of installing four (4) supply wells and one (1) injection well for FKAA's new Crawl Key Reverse Osmosis treatment facility in Marathon, FL. PRebid meeting- Meeting ID: 226 588 830 102 3 Passcode: FU9eP7hb The meeting can also be attended by phone: Dial in by phone +1 850-792-4985 Phone conference ID: 414 153 728# Question Deadline 11/10/2025 Any person contemplating the submission of a Proposal shall have thoroughly examined all of the various parts of these documents; should there be any doubt as to the meaning or intent of said Contract Documents, the Bidder should request of the FKAA, via eBuilder Bid Portal (at least 6 working days prior to bid opening), an interpretation thereof.

Award

Water / Sewer

$948,000.00

Public - State/Provincial

Site Work

3

11

6

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
7
Bidding Soon
76
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2025

December 18, 2025

Project location map

1100 Kennedy Dr, Key West Nas, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.