Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 17, 2026 at 8:00 PM
Updated May 16, 2026
Site work and paving for a mixed-use development in Hickory, North Carolina. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
The Project Generally Consists of the furnishing of all materials, labor and equipment for the construction of a 0.582 mi long multi-use path along roadway sections between 17th St NW Extension and Aviation Walk Trail along Clement Blvd NW and 19th St Ln NW (BL0067) and between 21st St NW and 19th St NW, and along 21 St NW between Clement Blvd NW and 9th Ave Dr NW (BL-0115) and all associated work including, but not limited to, grading, paving, drainage, and retaining wall. All Bidders must be prequalified by NCDOT as a Prequalified Bidder or PO Prime for their specific discipline and must comply with the requirements of the State of North Carolina and be appropriately licensed as a Contractor as provided in General Statutes Chapter 87. Before beginning work, subcontractors of all levels must be prequalified by the NCDOT to perform the specified work codes The Owner reserves the right to reject any and all Bids, to waive informalities, or to reject nonconforming, non-responsive, or conditional bids. The Owner reserves the right to award a contract to the lowest, responsive, responsible bidder or bidders, taking into consideration quality, performance, and time. All questions related to this bid shall be submitted in writing to Clinton Pruett - cpruett@tgsengineers.com and Kelly Winkler - kwinkler@hickorync.gov by 5:00 PM on April 30, 2026 to receive consideration. NC DOT -, Aviation Walk Connector and Aviation Museum Connector The date of availability for this contract is June 22, 2026, except that work in jurisdictional waters and wetlands shall not begin until a meeting between the DOT, Regulatory Agencies, and the Contractor is held as stipulated in the permits contained elsewhere in this proposal.
Post-Bid
Sidewalks / Parking Lot
$700,000.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2026
June 22, 2026
19th St Ln NW & Clement Blvd NW, Hickory, NC
Related To This Project
Hickory, NC
Bid Date: Oct 31 2025
Hickory, NC
Bid Date: Nov 13 2025
Hickory, NC
Bid Date: Nov 17 2025
Hickory, NC
Bid Date: Nov 18 2025
Hickory, NC
Bid Date: Nov 19 2025
Hickory, NC
Bid Date: Jan 29 2026
Hickory, NC
Bid Date: Jan 13 2026
Hickory, NC
Bid Date: Dec 19 2025
Hickory, NC
Bid Date: Oct 17 2025
Hickory, NC
Bid Date: Mar 19 2019
Hickory, NC
Bid Date: Sep 22 2025
Hickory, NC
Bid Date: Sep 24 2025
Hickory, NC
Bid Date: Aug 21 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
