BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 17, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a mixed-use development in Hickory, North Carolina. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The Project Generally Consists of the furnishing of all materials, labor and equipment for the construction of a 0.582 mi long multi-use path along roadway sections between 17th St NW Extension and Aviation Walk Trail along Clement Blvd NW and 19th St Ln NW (BL0067) and between 21st St NW and 19th St NW, and along 21 St NW between Clement Blvd NW and 9th Ave Dr NW (BL-0115) and all associated work including, but not limited to, grading, paving, drainage, and retaining wall. All Bidders must be prequalified by NCDOT as a Prequalified Bidder or PO Prime for their specific discipline and must comply with the requirements of the State of North Carolina and be appropriately licensed as a Contractor as provided in General Statutes Chapter 87. Before beginning work, subcontractors of all levels must be prequalified by the NCDOT to perform the specified work codes The Owner reserves the right to reject any and all Bids, to waive informalities, or to reject nonconforming, non-responsive, or conditional bids. The Owner reserves the right to award a contract to the lowest, responsive, responsible bidder or bidders, taking into consideration quality, performance, and time. All questions related to this bid shall be submitted in writing to Clinton Pruett - cpruett@tgsengineers.com and Kelly Winkler - kwinkler@hickorync.gov by 5:00 PM on April 30, 2026 to receive consideration. NC DOT -, Aviation Walk Connector and Aviation Museum Connector The date of availability for this contract is June 22, 2026, except that work in jurisdictional waters and wetlands shall not begin until a meeting between the DOT, Regulatory Agencies, and the Contractor is held as stipulated in the permits contained elsewhere in this proposal.

Post-Bid

Sidewalks / Parking Lot

$700,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
116
Bidding Soon
1,602
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2026

June 22, 2026

Project location map

19th St Ln NW & Clement Blvd NW, Hickory, NC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.