Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 6, 2026 at 7:00 PM
Updated February 7, 2026
Site work for a civil project in Kewa, New Mexico. Completed plans call for site work for a water / sewer project.
The project includes but is not limited to Construction Administration and observation services for the Waste Water Treatment Plant (WWTP) Project B - Entrance Works Facility and Primary Lift Station (Refer to RFP package for complete scope of services). This is one of three phases of the new wastewater treatment plant for Santo Domingo Pueblo. Project B is planned to be constructed concurrently with WWTP Projects A and C. Project A is currently under construction with an estimated completion date of late 2026 and consists of overall development of the 19-acre WWTP site, new wastewater facilities, administration building, and transfer station. Project B will occupy the Project A site for construction of a new Entrance Works Facility, new lift station, and all related electrical, mechanical, piping, and sitework. The Project is funded by the US Department of Agriculture Rural Development and will adhere to all USDA-RD requirements. The Work involves constructing Project B of the Santo Domingo Pueblo Wastewater Treatment Plant and Site Improvements. Projects A (WWTP and Site Development) and C (Dewatering and Disinfection Facilities), which will complete the WWTP, are to be constructed by others concurrently with Project B; construct Entrance Works Facility, including cast-in-place concrete channel structures equipped with cylindrical fine screen, manual bypass screen, Parshall flume, open channel isolation gates, down-opening weir gates, dual gravity grit channels, ventilation system equipped with biofilter for odor control. Entrance Works Building: CMU building with wood truss roof building, approximately 91' x 21' W x 17' parapet height. Primary Lift Station: Install three 25 HP influent pumps in wet well, check valves and isolation valves in valve vault, jib crane, and controls equipment with variable frequency drives; construct new yard piping throughout the Project B site connecting to yard piping constructed under Project A, including washwater, gravity sewer, force main, drain lines, and natural gas; install electrical sitework; install electrical, instrumentation, controls, and supervisory equipment to serve equipment throughout the Project B area; and construct sitework throughout the Project B area. Question Deadline 12/04/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Casey Cook, P.E. (ccook@molzencorbin.com)
Post-Bid
Water / Sewer
$500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2025
January 15, 2026
134 Tesuque St, Kewa, NM
Related To This Project
Kewa, NM
Bid Date: Dec 05 2025
Kewa, NM
Bid Date: Dec 05 2025
Kewa, NM
Bid Date: Mar 15 2025
Kewa, NM
Bid Date: Sep 19 2024
Kewa, NM
Bid Date: Dec 20 2024
Kewa, NM
Bid Date: Nov 10 2023
Kewa, NM
Bid Date: Nov 30 2021
Kewa, NM
Bid Date: May 26 2023
Kewa, NM
Bid Date: Aug 02 2022
Kewa, NM
Bid Date: May 27 2022
Kewa, NM
Bid Date: Jun 23 2022
Kewa, NM
Bid Date: Jan 19 2023
Kewa, NM
Bid Date: Sep 22 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
