Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 25, 2025 at 7:00 PM
Updated November 26, 2025
Site work for a water / sewer project in Northport, New York. Completed plans call for site work for a water / sewer project.
Contractor shall provide all personnel, equipment, materials, and services necessary to perform maintenance dredging of the entrance channel into the mooring basin at USCG Station Eaton's Neck, including all incidental related work. Dredging is restricted to mechanical methods, with an estimated 6,000 cubic yards of sand, gravel, and cobbles to be removed. All dredging work must be completed no later than 24 March 2026 in accordance with NY DEC permit restrictions. If post-dredge surveys indicate deficiencies, the contractor shall use the remaining time in March to correct them. No work is permitted after 31 March 2026 due to environmental restrictions. Dredging operations must allow navigation through the channel at all times. The contractor shall provide a cost per cubic yard for dredging, which will be used for contract adjustments based on actual quantities removed within the specified limits. Material shall be disposed of at the USCG Station Eaton's Neck Beach Site as identified in ACOE Permit # NAN-2016-00301. Due to shallow boulders and obstructions, barge access to the eastern half of the Beach Site is not possible; material placement in this area requires upland transport from barges positioned at the western half. Submit Any Questions to the Contract Specialist via Email at Cintia.m.desrosiers-rivera@uscg.mil Not Later Than 05 December 2025, at 4:00 Pm Local Time, Warwick, RI. The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 110 calendar days* The estimated value of the procurement is between $500,000 and $1,000,000. A 20% bid guarantee is required. Performance and Payment bonds will be required. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Water / Sewer
$1,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 23, 2025
January 22, 2026
12 Lighthouse Rd, Northport, NY
Related To This Project
Northport, NY
Bid Date: Nov 14 2025
Northport, NY
--
Northport, NY
--
Northport, NY
Bid Date: Aug 07 2025
Northport, NY
--
Northport, NY
Bid Date: Sep 05 2025
Northport, NY
Bid Date: Jun 18 2025
Northport, NY
Bid Date: Jun 16 2025
Northport, NY
Bid Date: May 16 2025
Northport, NY
Bid Date: Feb 20 2025
Northport, NY
Bid Date: Jul 14 2025
Northport, NY
Bid Date: May 08 2025
Northport, NY
Bid Date: Jan 06 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
