BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2025 at 7:00 PM

Updated November 26, 2025

Site work for a water / sewer project in Northport, New York. Completed plans call for site work for a water / sewer project.

Contractor shall provide all personnel, equipment, materials, and services necessary to perform maintenance dredging of the entrance channel into the mooring basin at USCG Station Eaton's Neck, including all incidental related work. Dredging is restricted to mechanical methods, with an estimated 6,000 cubic yards of sand, gravel, and cobbles to be removed. All dredging work must be completed no later than 24 March 2026 in accordance with NY DEC permit restrictions. If post-dredge surveys indicate deficiencies, the contractor shall use the remaining time in March to correct them. No work is permitted after 31 March 2026 due to environmental restrictions. Dredging operations must allow navigation through the channel at all times. The contractor shall provide a cost per cubic yard for dredging, which will be used for contract adjustments based on actual quantities removed within the specified limits. Material shall be disposed of at the USCG Station Eaton's Neck Beach Site as identified in ACOE Permit # NAN-2016-00301. Due to shallow boulders and obstructions, barge access to the eastern half of the Beach Site is not possible; material placement in this area requires upland transport from barges positioned at the western half. Submit Any Questions to the Contract Specialist via Email at Cintia.m.desrosiers-rivera@uscg.mil Not Later Than 05 December 2025, at 4:00 Pm Local Time, Warwick, RI. The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 110 calendar days* The estimated value of the procurement is between $500,000 and $1,000,000. A 20% bid guarantee is required. Performance and Payment bonds will be required. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Water / Sewer

$1,000,000.00

Public - Federal

Site Work

8

11

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
868
Active Projects
467
Bidding Soon
6,887
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 23, 2025

January 22, 2026

Project location map

12 Lighthouse Rd, Northport, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.