BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2026 at 7:00 PM

Updated January 21, 2026

Demolition and site work for a civil project in Lake Almanor, California. Completed plans call for site work for a one-story above grade water / sewer project; one-story above grade water / sewer project; one-story above grade water / sewer project; one-story above grade water / sewer project; one-story above grade water / sewer project; and one-story above grade water / sewer project.

Separate sealed bids are requested for the construction of the Drinking Water System Improvements Project for Clear Creek Community Services District. The work includes replacement of the existing Spring House structure; installation of 62 feet of restrained 8-inch pipe in a creek; pipe bursting (Additive Alternate 1) or slip lining (Additive Alternate 2) 305 feet of existing 8-inch AC raw water main; installation of 122 feet of 8-inch raw water PVC main; construction of a new 17-foot by 15-foot Park Pump Station with two 15 HP, VFD-controlled vertical turbine can pumps; reconnection to the existing emergency generator; installation of 393 feet of 6-inch and 2,530 feet of 12-inch water main; construction of a 390,000-gallon prestressed concrete tank with yard piping; installation of 2,623 feet of 8-inch water main and emergency intertie with the Westwood Community Services District; and demolition of an existing pump station and hydro tank. Additive Alternate 3 includes a portable pump station. Bids are to be submitted for a single prime contract on a lump-sum/unit-price basis, and will be evaluated on the Base Bid amount. The prestressed concrete tank is designated a Specialty Item. Each bid must comply with the bidding documents, construction drawings, and specifications. Bidders must have a Class A California Contractor's license. All contractors and subcontractors must be registered with the Department of Industrial Relations as required. The project is funded in part by the State of California, and payment of prevailing wages is required. The Owner reserves the right to accept or reject all bids and to award the contract in the best interest of the Owner. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Engineer's Construction Cost Estimate is $5,000,000 to $5,500,000.

Award

Water / Sewer

$9,712,426.00

Public - County

Demolition, Site Work

87

26

57

4

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
35
Bidding Soon
299
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

January 14, 2026

Project location map

To be determined, Lake Almanor, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.