Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 23, 2025 at 7:00 PM
Updated December 24, 2025
Site work, paving and new construction of a mixed-use development in Fort Smith, Arkansas. Completed plans call for the construction of a 25,000-square-foot military facility; for site work for a military facility; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The project consists of constructing an approximately 25,000-square-foot, three-bay aircraft maintenance hangar to support the beddown of F-35 aircraft at Ebbing Air National Guard Base in Fort Smith, Arkansas. The acquisition will be conducted under full and open competition using a best value trade-off procurement method in accordance with FAR Part 15. The estimated magnitude of construction, as per DFAR 236.204, is between $25,000,000 and $100,000,000. The applicable NAICS code is 236220 for Commercial and Institutional Building Construction, with a size standard of $45,000,000. Place of Performance 4850 Leigh Ave. Fort Smith, AR 72903 The contractor shall begin performance within 10 calendar days and complete it within 730 calendar days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Military
$100,000,000.00
Public - Federal
New Construction, Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 27, 2026
February 6, 2026
4850 Leigh Ave, Fort Smith, AR
Related To This Project
Fort Smith, AR
Bid Date: Nov 18 2025
Fort Smith, AR
Bid Date: Nov 21 2025
Fort Smith, AR
Bid Date: Nov 13 2025
Fort Smith, AR
Bid Date: Nov 13 2025
Fort Smith, AR
Bid Date: Dec 05 2025
Fort Smith, AR
Bid Date: Dec 03 2025
Fort Smith, AR
--
Fort Smith, AR
--
Fort Smith, AR
Bid Date: Oct 14 2025
Fort Smith, AR
Bid Date: Oct 21 2025
Fort Smith, AR
Bid Date: Oct 17 2025
Fort Smith, AR
Bid Date: Oct 24 2025
Fort Smith, AR
Bid Date: Oct 09 2025
Fort Smith, AR
Bid Date: Oct 09 2025
Fort Smith, AR
Bid Date: Oct 02 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
