Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 25, 2026 at 8:00 PM
Updated March 26, 2026
Site work, paving and new construction of a mixed-use development in Fort Smith, Arkansas. Conceptual plans call for the construction of a 50,000-square-foot, one-story above grade military facility; for site work for a military facility; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
This is a SOURCES SOUGHT announcement, a market survey for information only, to be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests. Respondents will be notified of the results of the evaluation upon request.The U.S. Army Corps of Engineers Tulsa District has been tasked to solicit for and award a contract for the design-bid-build construction of an approximately 50,000 square foot 3-bay aircraft maintenance hangar, 3,000 square foot parts storage building, 1,500 square foot equipment storage building, and 2,000 square foot hazardous material storage building to support the bed down of the F-35 aircraft located in Fort Smith, Arkansas. complete it within 730 calendar days. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Military
$100,000,000.00
Public - Federal
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 2, 2026
April 26, 2027
4850 Leigh Ave, Fort Smith, AR
Related To This Project
Fort Smith, AR
Bid Date: Nov 18 2025
Fort Smith, AR
Bid Date: Nov 21 2025
Fort Smith, AR
Bid Date: Nov 13 2025
Fort Smith, AR
Bid Date: Nov 13 2025
Fort Smith, AR
Bid Date: Dec 05 2025
Fort Smith, AR
Bid Date: Dec 03 2025
Fort Smith, AR
Bid Date: Mar 06 2026
Fort Smith, AR
--
Fort Smith, AR
Bid Date: Oct 14 2025
Fort Smith, AR
Bid Date: Oct 21 2025
Fort Smith, AR
Bid Date: Oct 17 2025
Fort Smith, AR
Bid Date: Oct 24 2025
Fort Smith, AR
Bid Date: Oct 09 2025
Fort Smith, AR
Bid Date: Oct 09 2025
Fort Smith, AR
Bid Date: Oct 02 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
