BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2026 at 7:00 PM

Updated January 8, 2026

Renovation of an educational facility in Jupiter, Florida. Completed plans call for the renovation of a educational facility.

Reference Number 0000404446 The School Board of Palm Beach County, Florida invites Certified General Contractors or Certified Building Contractors prequalified by the School Board, pursuant to SREF Chapter 4.1 prior to the Proposal Due Date, to submit a Proposal for: The ARCHITECT shall provide all necessary professional services to deliver Permitted Design Documents within the established Construction Budget and in accordance with the established Design Schedule. The CONSTRUCTION MANAGER shall provide all Preconstruction Phase Services necessary to establish a GMP as well as all Construction Phase Services following Award of the GMP for the school identified in this Project Notification. The CONSTRUCTION MANAGER may be required to complete portions of the construction on an occupied campus as directed by the OWNER. The CONSTRUCTION MANAGER shall provide the remodel, renovation, and/or building addition of core-related spaces, which may include the dining/stage area, kitchen, clinic, administration spaces, media center, restrooms, exterior corridor access, and related parking areas, with site modifications as needed. Construction shall incorporate all of the requirements outlined in the Permitted Construction Documents, School District of Palm Beach County Master Specifications, District Design Criteria, State Requirements for Educational Facilities (SREF) 2014, Florida Administrative Code (FAC) Chapter 6A-2 and Florida Building Code. The CONSTRUCTION MANAGER shall prepare all Project Documents in accordance with the requirements stated in Department of Education's Chapter 6A-2, SREF and FAC. The required deliverables include, but are not limited to: A Scope Validation Report, Statement of Probable Construction Cost, Project Schedules, Phasing of Design Plans as directed by the OWNER, Completion of permitted Construction Documents within the specified Design Schedule, Life Safety plan, updated FISH Plans, FF&E Schedule & Specifications, Design Calculations, Life Cycle Cost Analysis, Color Charts, and Finish Schedules. The ARCHITECT will be required to certify that the permitted design complies with one of the energy-efficient and sustainable building standards per F.S. 255.2575. The Permitted Design must incorporate all requirements outlined in the Florida Building Code, Florida Accessibility Code, and State Requirements for Educational Facilities, NFPA Standards, District Master Specifications, District Design Criteria, and all other applicable specifications. Question Deadline 12/08/2025 at 2:00 PM ET Questions are submitted online Yes DESIGN NOTICE TO PROCEED MARCH 18, 2026 PERMITTED CONSTRUCTION DOCUMENTS NOVEMBER 30, 2026 GMP BOARD APPROVAL JANUARY 18, 2027 SUBSTANTIAL COMPLETION JANUARY 17, 2028 FINAL COMPLETION APRIL 16, 2028

Post-Bid

Educational

$3,800,000.00

Public - County

Renovation

13

11

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
100
Bidding Soon
1,545
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2025

January 22, 2026

Project location map

4750 Dakota Dr, Jupiter, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.