BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 29, 2025 at 8:00 PM

Updated November 6, 2025

Renovation of an educational facility in Westminster, Vermont. Working plans call for the renovation of a educational facility.

The Westminster School Board is seeking Proposals for Bathroom Renovations per plans and specifications provided. The outline of the work is provided below: Work to be conducted during off hours from the normal school calendar and regular hours. It is the Owner's desire to commence the work immediately after awarding the contract. The Owner will participate in creating the schedule ofthe work with the selected contractor. Work shall be conducted with a minimum amount of disruption to the daily activities. Bidder will be responsible for all work required, as a single source, including any cut and patch, coring, drilling, fire sealant and any other trades required, including daily cleanup. Temporary shutdowns will only be conducted after hours or on days when school is out and there are minimal occupants within the building. Fire alarm systems will be returned to duty at the end of each work period to accommodate occupancy during normal operating hours. The project requires a schedule of values to be provided after the initial contract award is made. Site walk throughs are encouraged. The Owner will not be responsible for any issues that arise due to bidders' unfamiliarity with the buildings. Bidders will be expected to be responsible for all building structural and existing conditions. Work to commence at the earliest possible start date as coordinated with the School Administrators. Work must be completed in a timely manner. Bidders shall provide their bid on the bid form attached. The successful bidder shall enter into an agreement with the Owner using an AIA 101- 2017 Edition and an AIA 20-2017 Edition Contract Form. Payment terms will include 10% retainage, net 30 days. This project will use Westminster School Board Capital funds. All activities related to this project will comply with the requirements of these funding sources. Respondents will be required to provide proof of insurance including General Liability coverage of a minimum $l,000,000/$2,000,000 and Statutory Workmen's Compensation. Respondents must direct all inquiries and correspondence in writing via email to Steve Horton: stevnhorton@gmail.com The method of Contractor Selection has not been Determined at this time.

Final Planning

Educational

$35,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
503
Active Projects
240
Bidding Soon
3,758
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2026

Project location map

301 School St, Westminster, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.