BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2026 at 8:00 PM

Updated May 20, 2026

Site work and new construction of a warehouse / distribution facility in Arcadia, Florida. Completed plans call for the construction of a 2,000-square-foot, one-story above grade warehouse / distribution facility; and for site work for a warehouse / distribution facility.

**As of April 10, 2026, the project was awarded to RD Welch Company, with an awarded amount of $137,014.44** Description: The DeSoto County Board of County Commissioners are seeking formal Bids from qualified firms and/or individuals to provide construction services for a pre-engineered metal storage building, including slab engineering and construction, in accordance with the Scope of Work, at 2250 NE Roan Street, as set forth in this Invitation to Bid. Pre-Bid/Proposal Conference: N/A PROJECT DESCRIPTION The Hope DeSoto Long Term Recovery Group, Inc., in coordination with DeSoto County, is seeking rebid proposals from qualified contractors to provide labor, materials, equipment, and services necessary for the construction of a 40-foot by 50-foot metal storage building at the above-referenced location. The project was previously bid and significantly overbudget, therefore a decision was made to cancel revise the scope and rebid the project. This rebid is intended to clearly define responsibilities between the Contractor and the County, including the County's intent to directly purchase certain materials. CONTRACTOR SCOPE OF WORK The Contractor shall furnish all labor, supervision, equipment, and materials necessary to complete the following: 1. Permitting and Coordination o Obtain all required building permits, excluding permit fees paid directly by the County. o Coordinate with DeSoto County personnel regarding work sequencing, inspections, trades, and County-provided items. 2. Site and Foundation Work o Layout the building footprint and foundation pad. o Design and engineer a concrete slab suitable for a 40' x 50' metal building in accordance with applicable codes. o Provide compaction testing and soil pre-treatment. o Excavate footers; form, pour, and finish the concrete slab. 3. Metal Building Erection o Erect a 40' x 50' metal building, including: Vinyl-backed ceiling insulation (ceiling only) Two (2) manual chain hoist 14' x 10' roll-up doors One (1) man door One (1) solar-powered light o Include all labor, equipment, and incidental materials required for erection. 4. Building Procurement (Base Bid with Deductive Option) o The base bid shall include the cost of the metal building and all associated expenses, including delivery, unloading, and unpackaging. o The County intends to utilize a direct purchasing option for the metal building. o Bidders shall clearly identify the separate cost of the metal building in their proposal to allow for a deductive change order if the County elects to purchase the building directly. 5. Site Restoration o Install sod around the perimeter of the building, extending up to ten (10) feet from the structure. WORK BY COUNTY (EXCLUDED FROM CONTRACTOR SCOPE) The following items will be provided by DeSoto County and shall be excluded from the Contractor's bid price: o Payment of permit fees (estimated at $1,500) o Grading and provision of fill dirt to build the pad o Construction of driveway access to the building o Unloading of the metal building upon delivery, the County has elected direct purchase so the contractor must work with the County on this to coordinate. The proposal shall separately identify the cost of the metal building (excluding tax) for deductive change order purposes. Project schedule shall be included with the rebid proposal. QA date - 2-17-2026 It is the responsibility of the bidder to contact the Purchasing Department prior to submitting a bid to ascertain if any addenda have been issued, to obtain all such addenda, and return executed addenda with the bid. Any questions relative to interpretation of requirements, scope of services or bid process shall be addressed in writing as indicated below. No inquires, if received within seven (7) days of the date set for the opening of bids, will be given consideration. Oral answers will not be authoritative.

Award

Warehouse / Distribution

$137,014.00

Public - County

New Construction, Site Work

8

7

2

3

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
139
Bidding Soon
2,371
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2026

March 26, 2026

Project location map

2250 NE Roan St, Arcadia, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.