BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 3, 2025

Site work and new construction of an educational facility in Saint Charles, Missouri. Completed plans call for the construction of a one-story above grade educational facility.

Bidders must pay workers no less than the prevailing hourly wage rates as set by the State of Missouri, Division of Labor Standards. The Board of Education will award the contract to the lowest responsible bidder who meets the terms but reserves the rights to reject any or all bids, reject any part of a bid, accept any bid in the best interest of the Board, solicit new bids, and waive any informalities or technicalities in the bid requirements and specifications. No pre-bid meeting is scheduled. Information regarding bidding instructions and requirements for obtaining bidding documents can be acquired from the architect. Question Deadline 12/01/2025 All requests for clarifications to the Architects office shall be submitted in writing The work of this contract comprises the New Restrooms for the Orchard Farm High School. Construct the work under a stipulated sum contract The Contractor shall coordinate the work, including the work of all subcontractors for the project. The Contractor shall schedule and conduct progress meetings. The Contractor is responsible for all overtime, weekend, or other premium time required to complete this project. No trade items (i.e.: piping, ductwork, conduit, etc.) are to be installed below the HVAC Equipment. This will allow for maintenance and replacement of the HVAC Equipment in the future. All HVAC units, controls, fire alarms, circuits, etc., shall be properly labeled with the appropriate room number. All HVAC equipment to include a plastic laminate I.D. applied sign. Same for Electrical panels. Prior to start of field work, the Owner's Representative shall hold a pre-construction conference at the site in a location to be designed, in order to discuss coordination, procedures, routing of delivery trucks, location of storage areas, requirements for Contractor's parking of vehicles, barricades, security and scheduling. The Contractor shall inform the Owner of both the starting and completion dates of the site work prior to beginning any particular phase of work at the site. additional doc acq note: A security deposit check will be required in the amount of $100.00, (One Hundred Dollars), for each set of bidding documents issued by the Architect to General Contractors. A set of bidding documents shall consist of one set of drawings, one set of specifications and details, and addenda as issued

GC Bidding

Educational

$1,000,000.00

Public - County

New Construction, Site Work

38

27

11

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
97
Bidding Soon
1,339
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2025

March 16, 2026

Project location map

2555 Hwy B, Saint Charles, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.