BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 16, 2025 at 7:00 PM

Updated December 17, 2025

Remodeling of a stadium in Saint Charles, Missouri. Completed plans call for the remodel of a stadium.

The project scope includes removal of existing roofing materials, installation of new architectural, impact-resistant shingles, and replacement of flashing and vents as specified. Proposals should include site clean-up as well. The selected contractor shall provide all labor, materials, equipment, supervision, and disposal necessary to complete the project as outlined below: o Removal and proper disposal of existing roof shingles and underlayment. o Inspection of existing roof decking. o Replacement of damaged plywood sheathing as necessary. (see Section 4 for unit pricing). o Installation of new architectural, impact-resistant asphalt shingles. o Installation of new ice and water shield, underlayment, and appropriate drip edge. o Flashing of all plumbing vent pipes with lead vent pipe flashing. o Removal and replacement of all other roof vents with like vents. o Installation of new ridge caps, sealants, and accessories per manufacturer's specifications. o Work to be completed during normal business hours

Bid Results

Arenas / Stadiums

$23,859.00

Public - City

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
232
Active Projects
129
Bidding Soon
1,255
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2025

January 2, 2026

Project location map

7001 MO-94, Saint Charles, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.