BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2025 at 7:00 PM

Updated December 5, 2025

Site work for a development in Manteno, Illinois. Completed plans call for site work for a one-story above grade development.

Request for Proposal are being sought for Village of Manteno 2025-26 Landscape Project. Specifications and other contract documents are available at the address listed and on the Village of Manteno Website. Sealed proposals will be received in the Office of the Village Clerk, 98 E Third St Manteno, IL 60950 until 10:00 AM Thursday December 4, 2025, and will then be opened publicly and read. The Village reserves the right to reject any and all proposals and waive technicalities. Questions should be directed to Jim Hanley, 815-929-4821. For any questions pertaining to the project please contact Public works Superintendent Jim Hanley at 815-929-4821 or 815-955-4274 The Village of Manteno is looking to update some of the older, dying off or overgrown landscaping at several locations. This is a design-build project based on the cost and appearance of the design. 1. Each of the 5 locations will need to be priced individually and the project will be awarded separately. 2. We are looking to remove all the current landscaping and install new products designed for the areas in question 3. Contractors must submit 3 copies of their design and a price for each of the proposed project sites. Contractors may submit multiple designs if desired. 4. The Mayor and Village Board will review all submitted designs and award the project accordingly. 5. This project is to start early spring 2026. Project Specifications Locations o Village Hall 98 E. Third St. o 3 sides of the building including the drive thru driveway o Add a mixture of some evergreen and deciduous plants, trees and outcroppings o Be aware of existing irrigation and make repairs if necessary o Add 3" of premium brown landscape mulch with a natural cut edge o Heritage Concession Stand o All 4 sides of the building and the pavilion on the east side of the building o Add a mixture of some evergreen and deciduous plants, trees and outcroppings o Add 3" of premium brown landscape mulch with a natural cut edge o Hasset Community Center o Front of the building o Add a mixture of some evergreen and deciduous plants, trees and outcroppings o Be aware of existing irrigation and make repairs if necessary o Add 3" of premium brown landscape mulch with a natural cut edge o Streetscapes -Third St. Main St. Division St. o Areas will be marked with a pink flags o Add a mixture of some evergreen and deciduous plants, trees and outcroppings o Add 3" of premium brown landscape mulch with a natural cut edge

Post-Bid

Conservation and Development

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
434
Active Projects
249
Bidding Soon
3,199
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

January 5, 2026

Project location map

To be determined, Manteno, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.