Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 13, 2025 at 7:00 PM
Updated December 5, 2025
Site work for a development in Manteno, Illinois. Completed plans call for site work for a one-story above grade development.
Request for Proposal are being sought for Village of Manteno 2025-26 Landscape Project. Specifications and other contract documents are available at the address listed and on the Village of Manteno Website. Sealed proposals will be received in the Office of the Village Clerk, 98 E Third St Manteno, IL 60950 until 10:00 AM Thursday December 4, 2025, and will then be opened publicly and read. The Village reserves the right to reject any and all proposals and waive technicalities. Questions should be directed to Jim Hanley, 815-929-4821. For any questions pertaining to the project please contact Public works Superintendent Jim Hanley at 815-929-4821 or 815-955-4274 The Village of Manteno is looking to update some of the older, dying off or overgrown landscaping at several locations. This is a design-build project based on the cost and appearance of the design. 1. Each of the 5 locations will need to be priced individually and the project will be awarded separately. 2. We are looking to remove all the current landscaping and install new products designed for the areas in question 3. Contractors must submit 3 copies of their design and a price for each of the proposed project sites. Contractors may submit multiple designs if desired. 4. The Mayor and Village Board will review all submitted designs and award the project accordingly. 5. This project is to start early spring 2026. Project Specifications Locations o Village Hall 98 E. Third St. o 3 sides of the building including the drive thru driveway o Add a mixture of some evergreen and deciduous plants, trees and outcroppings o Be aware of existing irrigation and make repairs if necessary o Add 3" of premium brown landscape mulch with a natural cut edge o Heritage Concession Stand o All 4 sides of the building and the pavilion on the east side of the building o Add a mixture of some evergreen and deciduous plants, trees and outcroppings o Add 3" of premium brown landscape mulch with a natural cut edge o Hasset Community Center o Front of the building o Add a mixture of some evergreen and deciduous plants, trees and outcroppings o Be aware of existing irrigation and make repairs if necessary o Add 3" of premium brown landscape mulch with a natural cut edge o Streetscapes -Third St. Main St. Division St. o Areas will be marked with a pink flags o Add a mixture of some evergreen and deciduous plants, trees and outcroppings o Add 3" of premium brown landscape mulch with a natural cut edge
Post-Bid
Conservation and Development
$300,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2025
January 5, 2026
To be determined, Manteno, IL
Related To This Project
Manteno, IL
Bid Date: Sep 26 2025
Manteno, IL
Bid Date: Mar 12 2019
Manteno, IL
Bid Date: Jul 10 2025
Manteno, IL
Bid Date: Apr 25 2025
Manteno, IL
Bid Date: Apr 02 2025
Manteno, IL
Bid Date: Mar 06 2025
Manteno, IL
Bid Date: Dec 13 2024
Manteno, IL
Bid Date: Dec 03 2024
Manteno, IL
Bid Date: Jan 13 2025
Manteno, IL
Bid Date: Sep 19 2024
Manteno, IL
Bid Date: Jan 17 2025
Manteno, IL
Bid Date: May 23 2024
Manteno, IL
Bid Date: May 15 2024
Manteno, IL
Bid Date: Apr 26 2024
Manteno, IL
Bid Date: May 02 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
