BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2026 at 7:00 PM

Updated January 15, 2026

Site work for a water / sewer project in Spring Lake, Michigan. Completed plans call for site work for a one-story above grade water / sewer project.

Wastewater System Improvements, Pump Station 21 & 29 Generator Additions. SCOPE OF PROJECT o The project consists of furnishing all material and constructing the following: o Providing and installing concrete pad-mounted 45kW natural gas generators and transfer switches at Pump Stations 21 and 29. o Providing and installing natural gas piping to the two pump stations. o Modifying each station's control panel as needed. o Including all necessary appurtenances and restoration. Pump Station 21 - 16531 152ND AVENUE SPRING LAKE, Ml 49456 Pump Station 29 - 15473 CLEVELAND STREET SPRING LAKE, Ml 49456 The project shall be completed by December 1, 2026. Question Deadline 11/26/2025 Requests must be received by the Engineer at least four business days prior to the bid. Questions related to the project shall be directed to Kevin Kieft, P.E. at 231-798-0101 or via email at kkieft@preinnewhof.com. The last day an addendum will be issued is three (3) business days prior to the bid. Questions to be addressed in the addendum will be received through 5:00 p.m. five (5) business daysprior to the bid. Only written addenda issued by the Engineer shall be binding. Oral interpretations, information or instructions by any office or employee of the Owner or Engineer are not authorized and therefore are not binding.

Award

Water / Sewer

$163,924.00

Public - County

Site Work

5

15

2

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
108
Bidding Soon
987
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2025

January 13, 2026

Project location map

Multiple Locations, Spring Lake, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.