BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 23, 2026 at 7:00 PM

Updated February 24, 2026

Site work, paving and outdoor lighting for a mixed-use development in Scranton, Pennsylvania. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; for outdoor lighting for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of February 23, 2026, this project has been awarded. Construction is expected to begin in March 2026 Scope of Work Involves Existing Concrete Pavement Replacement and Restoration on 4.624 Miles of Interstate 81 (I-81) and 2.398 Miles of Interstate 84 (I-84) as Well as on Select Ramps. Traffic Will Be Maintained Using Staged Construction and Ramp Detours as Needed. In Addition, the Project Includes Bridge Preservation Work, Roadway Barrier Upgrades, Drainage Updates, New Signing and Pavement Markings, a New Area-wide Its System, and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route Sr 81 / Sr 84, Section 230, in Lackawanna County, City of Scranton / Dunmore Borough From Approximately 0.2 Miles North of Sr 307 at Nb/sb Segment 1844/1845 Offset 1575/0915 to Approximately 0.2 Miles South of Dickson City at Nb/sb Segment 1890/1891 Offset 1907/1777 and From Approximately 0.5 Miles East of Sr 347 at Eb/wb Segment 0006/0007 Offset 0000/0000 to Approximately 1.5 Miles West of I-380 at Eb/wb Segment 0014/0015 Offset 1421/1555. Project Cost Range: $125,000,000.00 - $149,999,999.99 Federal Project Status: Federal Oversight DBE: 0% Structure Work: 16.00% Pre-bid Meeting: Optional Anticipated Ntp: 02/23/2026 Wage Rates: Yes Required Completion: 07/30/2031 Prequalification Requirement: Yes State Type of Work: Highway Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - I-81 NB/SB Preservation Pavement Replacement Lackawanna *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$126,482,689.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

2486

24

358

9

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
19
Bidding Soon
1,472
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2026

March 30, 2026

Project location map

SR-81, Scranton, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.