BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 5, 2025

Site work for a water / sewer project in Urbandale, Iowa. Completed plans call for site work for a water / sewer project.

The work to be done is as follows: TRUNK SEWER EXTENSION - SOUTH OF AURORA TO MEREDITH DRIVE - CONTRACT 1 Construct the Trunk Sewer Extension - South of Aurora to Meredith Drive - Contract 1 including all materials, labor and equipment necessary for approximately 3,102 linear feet of 8" to 12" diameter sanitary sewer trenched installation, 125 linear feet of 12" sanitary sewer trenchless installation, connecting to existing manholes, excavation and backfill, traffic control, erosion control, seeding and other miscellaneous associated work, including cleanup. The project is located in the 13800 block from Aurora Avenue to Meredith Drive in the City of Urbandale. Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied in a sealed envelope by either (1) a certified or cashier's check drawn on a solvent Iowa bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to ten percent (10%) of the bid, or (2) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of ten percent (10%) of the bid. The Board of Trustees reserves the right to reject any or all bids and to waive informalities or technicalities in any bid. The successful bidder will be required to furnish a bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the Board of Trustees and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the Urbandale Sanitary Sewer District from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of four (4) years after its completion and acceptance by the Board of Trustees. The work under the contract shall commence within ten (10) days after the date set forth in the Notice to Proceed. The sewer from Manhole 5 to Manhole 9 shall be completed by April 1, 2026 (Interim Completion Date). All work on the project shall be completed by July 31, 2026. Liquidated damages in the amount of One Thousand Dollars ($1,000) per calendar day that the work required under the Interim Completion Date shall remain uncompleted. Liquidated damages in the amount of Five Hundred Dollars ($500.00) per calendar day will be assessed for each calendar day that work shall remain uncompleted after the end of the contract period, with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. Separate assessments of liquidated damages may be imposed.

Post-Bid

Water / Sewer

$800,000.00

Public - City

Site Work

13

6

2

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
99
Bidding Soon
1,117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

January 5, 2026

Project location map

Multiple Locations, Urbandale, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.