BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Site work for a water / sewer project in McAlisterville, Pennsylvania. Completed plans call for site work for a one-story above grade water / sewer project.

Production Well (PW-04) for the Dunn Valley Water Campus The work includes the drilling of a new production well at the Dunn Valley Water Campus, installation of well casing and fittings, installation of well pump and appurtenances, installation of piping to the connection point at the well building, and installation of a pitless adapter. Sealed bids, one original and two copies, must be submitted by mail, in-person or electronically. A certified check or bank draft payable to the order of OWNER, or a satisfactory Bid Bond executed by the bidder and an acceptable surety in an amount equal to ten percent (10%) of the total of the bid, must be submitted with each bid. The bidder must include the fully completed Non-Collusion Affidavit with the bid. The project requires compliance with Equal Employment requirements, specific minority and female participation goals, and federal mandates related to MBE/WBE and Section 3 business concerns. The contractor must also adhere to the Buy America, Build America Act and Davis-Bacon and Related Acts. Documentation showing solicitations and commitments to minority and women business enterprises and Section 3 business concerns must be submitted with the bid. The contractor shall strive to meet the MBE goal of 5% and WBE goal of 3% for contracts of $25,000 or more, and applicable Section 3 workforce requirements for certain federally funded projects. The owner reserves the right to reject any or all bids, waive irregularities, or negotiate contract amounts. Bids may be held by the owner for up to 60 days from the date of opening for review and qualification purposes. The McAlisterville Area Joint Authority will receive bids for the PRODUCTION WELL (PW-04), for the Dunn Valley Water Campus. The PRODUCTION WELL Contract (PW-04) includes the following items of work: Drilling of new production well at the Dunn Valley Water Campus Installation of well casing and fittings, inclusive Installation of well pump and appurtenances Installation of piping to connection point at well building Installation of pitless adapter Question Deadline 12/10/2025 at 4:00 PM ET All questions regarding this project shall be submitted via online.

Sub-Bidding

Water / Sewer

$300,000.00

Public - City

Site Work

9

11

2

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
122
Bidding Soon
1,308
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2025

January 16, 2026

Project location map

Dunn Valley Rd, McAlisterville, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.