Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 13, 2026 at 7:00 PM

Updated January 14, 2026

Site work for a water / sewer project in Lewiston, Idaho. Working plans call for site work for a one-story above grade water / sewer project.

**As of January 13th, 2026, the owner has selected a Construction Manager. A timeline for construction has not yet been established.** Lewiston Orchards Irrigation District is seeking proposals from Construction Manager General Contractors registered in the State of Idaho to provide preconstruction engineering and construction phase services for the Clearwater River Pump Station located one mile east of Lewiston, including the approximately 7-mile transmission main to Mann Lake.

Pre-Construction/Negotiated

Water / Sewer

$10,000,000.00

Public - City

Site Work

197

6

4

2

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
6
Bidding Soon
214
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 27, 2025

January 31, 2026

Project location map

To Be Determined, Lewiston, ID


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed