Published January 21, 2026 at 7:00 PM
Updated January 22, 2026
Site work for a water / sewer project in Fresno, California. Completed plans call for site work for a water / sewer project.
For construction of storm drainage facilities in drainage area "Bo",contract "Bo-37", fresno county, california. As provided for in section 7-7 of the standard specifications, contractor and all subcontractors shall be solely responsible for complying with all statutes and regulations governing the payment of prevailing wages, including, without limitation, labor code sections 1725.5, 1771, 1774 and 1775, as amended. Moreover, this contract is subject to monitoring and enforcement by the california department of industrial relations (dir). The contractor and its subcontractors are required to register with dir and submit certified payroll reports to dir and the district. Only contractors and subcontractors registered with dir can bid on district work or work under district contract. The contractor and its subcontractors shall register with the dir by following the registration instructions on the dir website at online. The contractor shall be solely responsible for complying with prevailing wage law and regulation and the proper enrollment and maintenance of records. The contractor shall be required to post a copy of the prevailing wages applicable to each trade used at each job site. The contractor shall also post those notices required by california code of regulations title 8, chapter 8, subchapter 4.5 section 16451(d), which are included in the appendix of these special provisions. The fmfcd contract "Bo-37" nc-2 k:\design\project plans and special provisions\projects\bo-37\bo-37 special provlslons.Docx immediately following the actual execution of the contract and furnishing of the required contractor's bonds, the board of directors will return the bidders' guarantees accompanying moreover, the contractor and all subcontractors shall inform themselves of, and shall comply with laws and regulations governing the payment of travel and subsistence as required by section 7-6 of the standard specifications. The quantities are approximate only, being given as a basis for the comparison of bids, and the board of directors does not expressly or by implication agree that the actual amount of work will correspond therewith but reserves the right to increase, or decrease, the amount of any class or portion of the work, or to omit portions of the work, as may be deemed necessary or advisable by the engineer. No contract will be awarded to a contractor who is not registered with dir, has not been licensed in accordance with the provisions of the contractors state license law, california business and professions code, division 3, chapter 9, as amended, and whose bid is not on the proposal form included in the contract document. A valid california contractor's license, class a, (general engineering) is required for this project. Contractor shall notify the district's engineering technician, adam johnson, at (559) 456- 3292, with any questions related to prevailing wages and/or dir requirements. Bids are required for the entire work described in the engineer's estimate of quantities following. The quantities are approximate only, being given as a basis for the comparison of bids, and the board of directors does not expressly or by implication agree that the actual amount of work will correspond therewith but reserves the right to increase, or decrease, the amount of any class or portion of the work, or to omit portions of the work, as may be deemed necessary or advisable by the engineer. No contract will be awarded to a contractor who is not registered with dir, has not been licensed in accordance with the provisions of the contractors state license law, california business and professions code, division 3, chapter 9, as amended, and whose bid is not on the proposal form included in the contract document. A valid california contractor'slicense, class a, (general engineering) is required for this project. Cash, a cashier's check, certified check or bidder's bond, in the amount of not less thanten percent (10%) of the amount of the bid, shall accompany each proposal, made payable to the order of the fresno metropolitan flood control district, as a guarantee that the bidder will, after being notified of the acceptance of his/her bid, make a contract withthe fresno metropolitan flood control district in accordance therewith, and will furnish the required contractor's bonds. The bonds required of the successful bidder are a faithful performance bond in the amount of one hundred ten percent (110%) of said bid and a payment bond in an amount equal to one hundred percent (100%) of the amount of said bid, in accordance with the provisions of sections 3247-3251 of the california civil code. If the successful bidder fails to execute the contract for which the bid is accepted and failsto furnish the required bonds within ten (10) days after the mailing of notice of the award of the contract to the successful bidder, the board of directors shall have just cause for annulment of the award and forfeiture of the proposal guarantee. Proof of insurance (certificate of insurance) certifying coverage in the minimum amounts required by these special provisions and section 7-13 of the standard specifications shall be submitted to the district before 5:00 p.M. On the second business day following the opening of bids or as extended in writing by the district. The district encourages the contractorto submit the required proof of insurance at the time of the bid opening to allow the district to check it for completeness so that the contractor can make any necessary revisions prior to such deadline. In this case, the board of directors reserves the right to award the contract to one of the other bidders or reject all bids. The board of directors reserves the right to reject any or all bids, to award or reject any combination of items as it sees fit, and to waive any informality in any bid received. Preliminary project cost $55,000-$65,000 *the value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Water / Sewer
$62,708.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 10, 2025
January 9, 2026
Manila Ave, Fresno, CA
Related To This Project
Fresno, CA
Bid Date: Dec 18 2025
Fresno, CA
Bid Date: Oct 21 2020
Fresno, CA
Bid Date: Jan 09 2026
Fresno, CA
Bid Date: Jan 23 2026
Fresno, CA
--
Fresno, CA
--
Fresno, CA
Bid Date: Dec 17 2025
Fresno, CA
Bid Date: Dec 16 2025
Fresno, CA
Bid Date: Dec 09 2025
Fresno, CA
Bid Date: Dec 17 2025
Fresno, CA
Bid Date: Dec 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.