Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 12, 2026 at 7:00 PM
Updated February 13, 2026
Renovation of an educational facility in Fresno, California. Completed plans call for the renovation of a educational facility.
**As of February 12th, 2026, the project was awarded to AMS.NET, LLC, with an awarded amount of $58,557.44** License Requirements C7 and/or C10 Liquidated Damages $1500/Day Start/Delivery Date On or about January 6, 2025 Complete on or before March 13, 2026 Project Duration 9 Weeks Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 12/12/2025 at 2:00 PM PT Online Q&A Yes, Q&A Contact Info Sofia McClellan 559-243-7246 sofia.mcclellan@scccd.edu. Successful bidder shall provide all labor, tools, and materials necessary to install new 24-strand fiber optic cable(s) from the CCC Main Cross connect (MC) located in Building AC1, Room 133T to the entrance telecom room (TR) of each CCC building as per design drawings and specifications. 1. The new fiber optic cable(s) shall be installed in parallel with the existing legacy fiber optic infrastructure, ensuring no disruption to current services. 2. Utilize existing pathways for cable routing wherever feasible to minimize construction impact and maintain compliance with building standards. 3. All work shall comply with applicable industry standards, local codes, and CCC specifications for fiber optic installation. 4. Contractor shall provide testing and certification of all installed fiber optic cables to verify performance and connectivity. The District will only consider bids that have been transmitted successfully and have been issued an e-bid confirmation number (VBID) with a timestamp from the bid management system. Transmission of bids by any other means will not be accepted. This is a Public Works Prevailing Wage Job
Award
Educational
$58,557.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 18, 2025
January 6, 2026
10309 N Willow Ave, Fresno, CA
Related To This Project
Fresno, CA
Bid Date: Oct 21 2020
Fresno, CA
Bid Date: Jan 09 2026
Fresno, CA
Bid Date: Jan 23 2026
Fresno, CA
--
Fresno, CA
--
Fresno, CA
Bid Date: Jan 20 2026
Fresno, CA
Bid Date: Dec 10 2025
Fresno, CA
Bid Date: Dec 17 2025
Fresno, CA
Bid Date: Dec 16 2025
Fresno, CA
Bid Date: Dec 09 2025
Fresno, CA
Bid Date: Dec 17 2025
Fresno, CA
Bid Date: Dec 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
