Published January 18, 2026 at 7:00 PM

Updated January 19, 2026

Site work and new construction of a municipal facility in San Diego, California. Completed plans call for the construction of a 40,151-square-foot municipal facility; and for site work for a municipal facility.

Question Deadline 01/08/2026 at 2:00 PM PT All requests for clarification of specifications or questions related to this RFQ, if any, during the RFQ period shall be directed to Kevin Lam at KevinL@sdhc.org Scope of Services The scope of required services for this solicitation are detailed in RFQ section Scope of Services. However, the Commission, at its sole election, reserves the right to expand the scope of services to be provided by the successful Bidder in the event that the Commission elects to purchase a project or projects, after the due diligence process has been completed. The Tenant Improvement Of An Existing Three-story, Approximately 40,151 Square Foot, Residential Suites Visitor Accommodations Facility R-1 And R-2 Occupancy, Located At 7798 Starling Drive, San Diego, California, 92105 Into An Sro Facility With A Change Of Use Of The R-1 Area Of The Building To R-2. This Project Is An Executive Order Permit Now 100% Affordable Emergency Housing Project. The Proposed Occupancy Is An R-2 Non-transient Facility. Residency Shall Be A Minimum Of 30 Days. 90 Existing Rooms, (Less 7 Converted To Offices Or Common Area And 2 Suites Combined Into Property Manager Unit #315) = 82 Total Rooms Proposed.within This Total, One Room (#315) Is Reserved For An Assistant Property Manager The Contractor shall provide all necessary services for the modernization of the project located 7798 Starling Drive, San Diego, CA 92123 to include: the interior and exterior rehabilitation of one (1) structure containing ninety (90) resident units and two (2) laundry rooms. The contractor will meet all current ADA, CBC, UFAS and Section 504 requirements for the completion of this project. Contractor shall provide full interpretation and guidance to the San Diego Housing Commission (SDHC) regarding the order of precedence amongst the various codes and shall proactively seek solutions that respect the order of precedence.

Post-Bid

Municipal

$5,000,000.00

Public - City

New Construction, Site Work

266

15

4

4

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
112
Bidding Soon
1,481
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2026

April 27, 2026

Project location map

7798 Starling Dr, San Diego, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.